Loading...
Vlg at CC S1/FP-CS 850507ae Date: Rev. No: 5-7-85 0 DEVELOPMENT IMPACT ANALYSIS Village at Cottonwood Creek, Section II General 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Development Name and size: 115.686 acres Owner: SBS Joint Venture Engineer: Weir & Associates Current zoning: PD Current status of development: Final Plat Location: Parkway Blvd. at Coppell Road Proposed density: N/A Annexation or land study required: N/A Issues resolved: None Issues to be resolved: None Dedications required: None at this time Impact 1. Traffic: Impact to be determined a. Off-site collector streets: Parkway Blvd. b. Off-site arterial streets: Coppell Road, Denton Tap Road 2. Sewer: a. Proposed mains: 1.41 mgd - 12" PVC b. Proposed connections to existing mains: Existing 15" MUD line 3. Water: 16" main in Parkway Blvd. 4. Drainage or Flow: to Cottonwood Creek 5. Schools: N/A a. Primary school: b. Middle school: C. Approvals and Fees 1. Fees: Item Final Plat Construction Permit Fee Water Availability Fee Sewer Availability Fee Parks Fees Required l~Lh~D_~9~_e~_~i~_~9 date $ loo.oo To be determined Deferred unt11 plattlng of individual lots Deferred Deferred Assessments and Pro Rata Charges: a. Item: Coppell Road Summary: 85 1.f. x $75 = $6,375.00 Item: Street lighting Summary: 8 lights @ $261 = $2,088.00 Ce Item: Street Signs Summary: 1 sign @ $144 = $144.00 Approvals a. Annexation b. Land study: P&Z, City Council c. Zoning: P&Z, City Council d. Preliminary Plat: City Engineer: Planning & Zoning: City Council: e. Final Plat City Manager: City Engineer: Planning & Zoning: City Council f. Construction Plans: City Manager: City Engineer: g. File approved plat: h. Letter of acceptance: i. Receive as-builts: j. End of warranty period: 12-12-84 12-20-84 1-22-85 ., ,5-6-85 5-16-85 ao Be Date: Rev. No: 5-6-85 0 DEVELOPMENT IMPACT ANALYSIS Village at Cottonwood Creek, Section I General 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Development Name and size: 33.162 acres, single family Owner: SBS Joint Venture Engineer: Current zoning: PD Current status of development: Final plat Location: NW corner Thweat Road & Coppell Road Proposed density: 2.05 lots/acre Annexation or land study required: N/A Issues resolved: ROW dedication Issues to be resolved: Flood plain filling approval from FEMA required Dedications required: Impact 1. Traffic: a. Off-site collector streets: Thweat Road, Parkway Blvd. b. Off-site arterial streets: Coppell Road 2. Sewer: a. Proposed mains: b. Proposed connections to existing mains: 3. Water: 16" main in Parkway Blvd.; 10" exist, main Thweat & Coppell 4. Drainage or Flow: to Cottonwood Creek 5. Schools: a. Primary school: 50 students b. Middle school: 25 students C. Approvals and Fees 1. Fees: Ite~ Final Plat Construction Permit Fee Water Availability Fee Sewer Availability Fee Parks Fees Required (when requirgd)L__ $ 1,860.00 33,991.00 34,000.00 34,000.00 10,200.00 Paid to .date . f Assessments and Pro Rata Charges: a. Item: Thweat Road Summary: 454.6' x $75/1.f. Item: Street Signs Summary: 5 sets at $143.75 Ce Item: Street Lights Summary: 10 ea. at $261 = $2,610 Approvals a. Annexation b. Land study: P&Z, City Council c. Zoning: P&Z, City Council d. Preliminary Plat: City Engineer: Planning & Zoning: City Council: e. Final Plat City Manager: City Engineer: Planning & Zoning: City Council f. Construction Plans: City Manager: City Engineer: g. File approved plat: h. Letter of acceptance: i. Receive as-builts: j. End of warranty period: 12-12-84 12-20-84 1-22-85 __5r.6-85 5-1 -85 July 19, 1985 Jim Sowell Company REAL ESTATE DEVELOPMENT & CONSTRUCTION 1112 Copeland Road, Suite 420 Arlington, Texas 76011-4994 817/261-4936 Ms. Caroline Morris Director of Planning City of Coppell P. O. Box 478 Coppell, Texas 75019 RE: Village at Cottonwood Creek City Fees Payment Under Protest Dear Ms. Morris: Enclosed is a check for $101,991.00 for payment of Construction Permit and Water and Sewer Availability Fees for the subject project. These fees were calculated by John Wankum of Ginn and Associates under the fee schedule which was in effect until May 28, 1985. These fees are being paid under protest, since we believe that fees on this plat should be calculated using the fee structure adopted on May 28, 1985. We understand that payment of these fees is required in order to proceed with utility construction. The fees determined by Mr. Wankum are shown below: Construction Permit Fee Water Availability Fee Sewer Availability Fee $ 33,991.00 34,000.00 34,000.00 $101,991.00 Notwithstanding our objection to the method of calculation of fees, we request a refund of 50% of the difference between the fees that we, as the land developer, would be required to pay under the fee structure passed on May 28, 1985, and those that we are now being required to pay in order to proceed with this development. My calculation of the refund due is shown on Exhibit 1. Sincerely, VILLAGE AT COTTONWOOD CREEK Tony ~elBalzo J Attachment EXHIBIT 1 Construction Permit Fee FEE DUE FROM DEVELOPER UNDER OLD FEE STRUCTURE $33,991.00 FEE DUE FROM DEVELOPER UNDER NEW FEE STRUCTURE $ 6,000.00 * DIFFERENCE $27,991.O0 REFUND DUE $13,995.50 Combined Water and Sewer Availability Fee $1,000.00 $220.00 $780.00 $390.00 per unit per unit per unit per unit Fee Required by City: $1,000.00 per unit X 68 units = $68,000.00 Refund Due: $ 390.00 per unit X 68 units = $26,520.00 TOTAL REFUND DUE $40,515.50 * 1 1/2 % of estimated street paving amount of $400,000.00 = $6,000.00 K~I,.3"II~'/ Received From Address ACCOUNT ~T. OF ~ou., BALANCE DUE