Vlgs of C P1/PP,FP-CS 850613Am
Be
Date:
Rev. No:
6-13-85
0
DEVELOPMENT IMPACT ANALYSIS
Villages of Coppell
General
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
Development Name and size: Villages of Coppell
Owner: Dimension/Brooks Corp.
Engineer: Nathan D. Maier
Current zoning:
Current status of development:
Location:
Proposed density:
Annexation or land study required: None
Issues resolved: Variance for alleys
Issues to be resolved: Status of DeForest
Dedications required: 10' along DeForest
Impact
1. Traffic:
a. Off-site collector streets:
b. Off-site arterial streets:
2. Sewer:
a. Proposed mains: 12" and 8"
b. Proposed connections to existing mains:
3. Water: 10" at MacArthur
4. Drainage or Flow: to Lakes of Coppell
5. Schools:
a. Primary school: 400 students
b. Middle school: 200 students
None
MacArthur Blvd. 4000 vpd
10" at MacArthur
C. Approvals and Fees
Fees:
Item
Preliminary Plat
Fees Required
(when required)
$ 1832
Paid to dat~ oo
2. Assessments and Pro Rata Charges: To be determined
a. Item:
Summary:
b. Item:
Summary:
Approvals
a. Annexation
b. Land study: P&Z, City Council
c. Zoning: P&Z, City Council
d. Preliminary Plat:
City Engineer:
Planning & Zoning:
City Council:
e. Final Plat
City Manager:
City Engineer:
Planning & Zoning:
City Council
f. Construction Plans:
City Manager:
City Engineer:
g. File approved plat:
h. Letter of acceptance:
i. Receive as-builts:
j. End of warranty period:
6-13-85