Loading...
Vlgs of C P2/FP-CS 871221 NATHAN D. MAIER CONSULTING ENGINEERS, INC. December 21, 1987 Ms. Taryon Bowman Planning & Zoning Dept. City of Coppell 255 Parkway Blvd. Coppell, TX 75019 Re: Villages of Coppell, Phase II, NDM No. 84-10-54 Dear Taryon: Attached please find 22 copies of the replat for the Villages of Coppell, Phase II, and 6 copies of the affected construction plans. The reason for this replat is to increase the size of the lots. The complete set of construction plans previously submitted were stamped and approved. All the utilities and the pavement are existing per approved plans. The water and sanitary sewer services are affected by this replat. Steve Morton, with the City of Coppell Public Works Dept., has been consulted and is aware of these changes. Jeff Hawkins, with the M.U.D. has also been consulted. Since the services are the only thing affected Ginn, Inc.'s office informed us they would not need to see these revisions. The water system has already passed chlortntzatton tests and the sanitary sewer has been television inspected and passed. The storm drainage and pavement are not affected by this change at all. If you have any questions, please do not hesitate to call me. JS~ld Attachment Sincerely, NATHAN D. MAIER CONSULTING ENGINEERS, INC. · Maier, P.E. Three NorthPark/8800 N. Centr&l Expwy./Suit~ 300/Dallas, Texas 75231/(214) 739-4741