Vly R Pl LB-F/R3-DR 960829 (6)TUELECTRIC
Comments for the city of Coppell
Development Review Committee
Pr~li,~,i,,~£ f] Fin.--1 ~i& t £o~-~~c/ ~~~ ~~/~
Date 8-29-96
~Other comments
Preliminary/Final Plat is not acceptable.
Easements will be required for proposed electric facilities.
A plat with easement requirements will be provided to the
developer.
Load information (size of structure, A/C / Heat Load) will
be required from the developer before easements can be
determined.
Please call me at 214-888-1307 if you have any questions.
Tim Brancheau
14400 Josey Lane Farmers Branch, Texas 75234