Loading...
Vlg at CC S4/FP-AG 920722(~~~~_ AGENDA REQUEST FORM ITEM CAPTION: PUBLIC HEARING: Consideration and approval of a replat of Village ~ Cottonwood Creek, Section IV, located at the southeast corner of Cop~n Road and Parkway Boulevard, at the request of Jim Sowell Construction Company. SUBMITTED BY: EVALUATION OF ITEM: Date of P & Z Meeting: June 18, 199Z STAFF REP.: Planning Director. Gary L. Rieb OTHER REP.: DATE: Decision of P & Z Commission: Aptroved (3-1) (Tunnell opposed); with the following conditions: conditions of ~ne s~a~[ recom_menda~ion wzi_ se included ,an the .'- which pz=t, include: a) that there be a 6 masonry wall along Parkway Boulevard, landscaping be included on all cul-de-sacs, landscaping be included along the Parkway, wooden screening lence De built along Minyard Drive, 1800 square foot minimum house size on area basically zoned SF-7, 2000 square ~oot on area zoned SF-9, and 2200 square foot on the lots abutting the flood way homeowners association be formed to maintain ail com_mon areas, and that the two additional easements being recommended by the City Engineer be included on the plat prior to being presented to t~e City Council Please see attached staff report for further details. BUDGET AMT. N/A A}~Tr. AMT +/- BUDGET FINANCIAL REVIEW BY A PPRO VED - 8Y CITY C~U,HCIL DATE ~/a~/~ LEGAL REVIEW . AGF_~,D^ R~QUEST FORM REVISED REVIEWED CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT VILLAGE @ COTTONWOOD CREEK, SECTION IV - REPLAT P & Z HEARING DATE: June 18, 1992 C. C. HEARING DATE: July 1~, 1992 LOCATION: The southeast corner of Coppell Road and Parkway Boulevard. SIZE OF AREA: 44.5 Acres, containing 152 sinGle-family lots. REQUEST: Approval of a replat. APPLICANT: Jim Sowell Construction Co. (Owner} Mr. Jim Sowell 4809 Cole Avenue Suite #250 Dallas, TX 75205 (214) 522-3739 The Nelson Corporation (EnGineer) Mr. Craig Curry 5999 Summerside Drive Suite #202 Dallas, TX 75252 (214) 380-2605 HISTORY: This property was rezoned from MF-1 and MF-2 to PD-$F-7 on April 14, 1992. The preliminary plat was approved on that same date. TRANSPORTATION: Parkway Boulevard is an existing four-lane divided (C4D) thoroughfare on the northern boundary of this property contained within an 85 foot riGht-of-way. Coppell is an unimproved two-lane street (C2U) contained within a variable width riGht-of-way - at this location it is 90-100' wide. SURROUNDING LAND USE & ZONING: North - vacant: MF-2 South - vacant, sinGle-family: TH-2, SF-0, SF-9 East - vacant; MF-2 (being reconsidered for SF-9 and SF-12) West - vacant: LI COMPREHENSIVE PLAN: The Comprehensive Plan indicates high density development as most appropriate for this site. residential ITEM 10 ANALYSIS: In all candor, we have had some difficulty in obtaining a final plat document which reflects all conditions agreed to when the zoning was granted on this parcel back in April. Specifically, conditions that were applied include: 6' masonry wall along Parkway Boulevard landscaping on all cul-de-sacs landscaping along Parkway wooden screening fence along Minyard Drive 1800 square foot minimum house size on area basically zoned SF-7, 2000 square foot houses on area basically zoned $F-9 and 2200 square foot houses on lots abutting the flood way homeowners association be formed to maintain all common areas These conditions need to be placed on the face of the plat [sheet 1), some additional easements need to be shown on the plat, and a clear understanding of location of screening walls and landscaping requirements through out this subdivision needs to be acknowledged by the applicant. With these conditions addressed, approval is recommended. ALTERNATIVES: 1) Approve the replat 2) Deny the replat 3) Modify the replat ATTACHMENTS: 1) Replat VLGCC4.STF iI i ~! l, llll !|IiI IIi fill I!Ii Ilii oo il::,i hill ii"',.,. II ii iii Il ,, illilil~ll ,iliil li '"['Il1 J:lill:!m?l ,r',, I~[i:il'i, , ,,lt,,,.l,,l. llll!!:iil:ii ~ il:~t~i:lllll [!i!:lll,ilh jllltlllti~l~ I! ! Il' !' ! I I ; J , ,. ,...,,.,ii t"~Sll'lf .I l:[l,.IIilll J Ill !1~ I Ii II! 1 !!!i i! i1 -'""" -' -' ' "~' ~J J J J .' J .U j: .' j ' j .' ' ~ .......................... :; : ......... ~ ..... ~llll I1]llllllllllllltllllllllllllllltlllllltlTlllllTllllrrrlllllT?rr[l~l Ill Corners of Coppell, Lots iR, 3R, and 4R, Block 1, located at the southeast corner of Sandy Lake Road and MacArthur Boulevard, at the request of Reklaw Partnership, Inc. with the following four conditions; (1) that all staff recommendations be met; (2) that a note be placed on the plat showing finished floor elevations; (3) agreement to maintain in a healthy and growing condition all landscaping on the property; and (4) designating the plat as a replat of the Corners of Coppell subdivision. Councilman Morton seconded the motion. The motion carried 7-0 with Mayor Pro Tem Smothermon and Councilmen Weaver, Thomas, Morton, Mayo, Robertson and Garrison voting in favor of the motion. Item 14 PUBLIC HEARING: Consideration and approval of a replat of Village at Cottonwood Creek, Section IV, located at the southeast corner of Coppell Road and Parkway Boulevard, at the request of Jim Sowell Construction Company. Gary Sieb, Director of Planning and Community Services, made the presentation to the Council and stated that the Planning and Zoning Commission recommended approval with seven conditions. Craig Curry, representing the applicant, also addressed the Council. Mayor Wolfe declared the Public Hearing open and asked if there were any citizens present to speak in favor of the request. There being no citizens in speaking in favor of the request, Mayor Wolfe asked if there were any citizens present to speak in opposition of the request. David Smith of 206 Winding Hollow, expressed his concerns about the increase in the traffic volume through the residential area. There being no other citizens who wished to speak in opposition of the request, Mayor Wolfe declared the Public Hearing closed. Councilman Robertson moved to approve a replat of Village at Cottonwood Creek, Section IV, located at the southeast corner of Coppell Road and Parkway Boulevard, at the request of Jim Sowell Construction Company, subject to the following conditions; 1) that there be a six inch masonry wall along Parkway Boulevard; 2) landscaping be included on all cul-de-sacs; 3) landscaping be included along Parkway; 4) wooden screening fence be built along Minyard Drive; 5) 1800 square foot minimum house size on area basically zoned SF-7, 2000 square foot on area zoned SF-9, and 2200 square foot on the lots abutting the flood way; 6) homeowners association be formed to maintain all common areas; and 7) that the two additional easements being recommended by the City Engineer be included on the plat prior to being presented to the City Council. Councilman Weaver seconded the motion. The motion carried 5-2 with Councilmen Weaver, Thomas, Mayo, Robertson and Garrison voting in favor of the motion and Mayor Pro Tem Smothermon and Councilman Morton voting against the motion. Item 15 Consideration and approval of a preliminary plat of Parks of Coppell, Tract IV, located north of Coppell High School and west of Denton Tap Road, at the request of Dan Dowdey and Associates, Engineers. Gary Sieb, Director of Planning and Community Services, made the presentation to the Council. Following discussion, the Council requested that the staff look at placing "no parking" signs along Parkway Boulevard. Councilman Robertson moved to approve the preliminary plat of Parks of Coppell, Tract IV, located north of Coppell High School and west of Denton Tap Road, at the request of Dan Dowdey and Associates, with the following conditions; (1) that the developer assure a pedestrian crossing under the bridge into Andrew Brown Parks be made; and (2) that the twenty foot easement to the Park be indicated on the plat and be maintained by the Homeowners Association. Councilman Morton seconded the motion. The motion carried 7-0 with Mayor Pro Tem Smothermon and Councilmen Weaver, Thomas, Morton, Mayo, Robertson and Garrison voting in favor of the motion. CM072292 Page 4 of 7 L I NDA MINUTES OF JULY 14, 1992 The City Council of the City of Coppell was scheduled to meet in Regular Called Session on Tuesday, July 14, 1992 at 6:00 p.m. in the City Council Chambers of Town Center, 255 Parkway Boulevard, Coppell, Texas. City Manager Alan D. Ratliff informed persons that were present that a quorum of the City Council was unable to be in attendance; however, several public hearings had been scheduled for the meeting. Therefore, because of a lack of a quorum of the City Council, the 'following action was taken: City Manager Alan D. Ratliff announced that the names and addresses of persons present and wishing to participate in each of the public hearings would be obtained and called on Gary Sieb, Director of Planning and Community Development t° read the captions and obtain the necessary information for each public hearing. PUBLIC HEARING: Consideration and approval of a zoning change request, Case #S-1060, (Slider and Blues), from (C) Commercial, to (C-SUP) Commercial Special Use Permit for the operation of a restaurant, located at the southeast corner of Sandy Lake Road and Denton Tap Road, at the request of Univest. Those persons who were present for the above public hearing were as follows: None Gary Sieb announced that due to a lack of a quorum, this public hearing has been rescheduled to Wednesday, July 22, 1992 at 7:00 p.m. PUBLIC HEARING: Consideration and approval of a replat of Village of Coppell, Phase III-B, located at the southwest corner of Allen Road and DeForest Road, at the request of Grand Homes, Inc. Those persons who were present for the above public hearing were as follows: None Gary Sieb announced that due to a lack of a quorum, this public hearing has been rescheduled to Wednesday, July 22, 1992 at 7:00 p.m. PUBLIC HEARING: Consideration and approval of a replat of Corners of Coppell, Lots iR, 3R, and 4R, Block 1, located at the southeast corner of Sandy Lake Road and MacArthur Boulevard, at the request of Reklaw Partnership, Inc. Those persons who were present for the above public hearing were as follows: None Gary Sieb announced that due to a lack of a quorum, this public hearing has been rescheduled to Wednesday, July 22, 1992 at 7:00 p.m. PUBLIC H~ARING, Consideration and approval of a replat of Village at Cottonwood Creek, Section IV, located at the southeast corner of Coppell Road and Parkway Boulevard, at the request of Jim Sowell Construction Company. Those persons who were present for the above public hearing were as follows: None CM071492