Loading...
Vlgs of C P3/PP-AG 900508 THeE CITY WITH A B~UTIFUL FUTURE AGENDA REQUEST FORM CITY COUNCIL MEETING May 8, 1990 ITEM NO. ITEM CAPTION: Phase III, located south of DeForest Road and east of Allen Road, at the request of Don Tipton Engineering. SUBMITTED BY: Consider approval of a preliminary plat for Villages of Coppell, EVALUATION OF ITEM: STAFF R~r¥ L. S nnin~ D±r. OTHER REP.: Public Works Department DATE: Date of Planning and Zoning Commission: April 19, 1990 Decision of Planning and Zoning Commission: Approved (4-0) with the condition that the Developer provide appropriate screening and barrier between the alley easement and DeForest Road on the north side of the property, as determined appropriate by the City staff, showing alleys as depicted on the plat and minimum street centerline radius shown on the plat. Applicant is requesting approval of a preliminary plat with the following conditions: 1. allow alleys to be placed as indicated on the plat, and permit minimum street centerline radius to be less than 425 feet to allow for the placement of Brentwood Drive. Please see attached staff report for further details. BI~)GET AMT.: COMd~ENTS: AMT. ESTIMATED: APPROVED BY CITY COIJN DATE FINANCIAL REVIEW BY: LEGAL REVIEW BY: AGEN~DA REQ FORM. 0588DS REVIEWED BY CM: CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT Villages of Coppell, Pbe~ III, Preliminary Plat P & Z HEARING DATE: April 19, 1990 C. C. HEARING DATE: May 8, 1990 LOCATION: South of DeForest Road and east of Allen Road, on a total of 23.88 acres of land. REQUEST: Approval of a preliminary plat along with the following variances as requested: 1) Allow alleys to be placed as indicated on the plat. 2) Minimum street center line radius to be less than 425 feet (as required by the Comprehensive Subdivision Ordinance), to allow for the placement of Brentwood Drive. SIZE OF AREA: 23.88 acres APPLICANT: Don Wipton Engineering (Mr. Pat Atkins) 6330 Beltline Road, Suite C Garland, Texas 75043 HISTORY: Villages of Coppell, Phase III, was previously submitted to the City as a preliminary plat in 1989. The plat, approved by the City Council on November 14, 1989, depicted a total of 101 single-family detached lots with a typical lot size of 60 X 100 feet. Two variances were requested at the time of the first submittal; to center the structures on the lot, and waiver of the alley requirement along certain lots. ANALYSIS: The preliminary plat for Villages of Coppell, Phase III as submitted is acceptable. Staff compared the most recent plat to the plat approved in November of 1989, and would like to point out the changes between the plats, for your information. 1) Typical lot size changes from 60 X 100 feet (on the previous plat), to 50 X 100 feet. 2) Total number of lots increased from 101 lots (on the previous plat), to 120 lots on the new plat. ITEM 5 Applicant is requesting approval of the preliminary plat with two (2) variances. A third variance is requested to center the houses on the lot, but this type of action must be approved by the Board of Adjustments. Therefore, action on variance request #2 as indicated on the preliminary plat, must be referred to the Board of Adjustments. ALTERNATIVES: 1) Approve the preliminary plat 2] Deny the preliminary plat ATTACHMENTS: 1) Preliminary plat 2) Reduced copy of preliminary plat approved by City Council on November 14, 1989. VLG3$TF '$/r.0' ",4 ~ APPROVED BY CITY COUNCIL ON 11/14/ 89 AS A PRELIMINARY PLAT TYPICAL LOT~O'X I00' 'TOTAL LO'TIIOl VILLAGES OF COIIpIII~bL Minutes of April 19, 1990 PLANNING AND ZONING COMMISSION The Planning and Zoning Commission of the City of Coppell met in pre-session at 7:00 p.m. and in regular session at 7:30 p.m., on Thursday, April 19, 1990, in the Coppell Town Center, 255 Parkway Boulevard, Coppell, Texas 75019. The following members were present: Chairman Joe Munsch Vice-Chairman Peyton Weaver Commissioner Melvin Gross Commissioner George Redford Also present were Director of Planning and Community Services Gary L. Sieb, P&Z Coordinator Taryon Bowman, Consultant Engineer John Karlsruher and Administrative Secretary Linda Glidewell. Commissioners Robert Green, Marsha Tunnell and Robert Scott were absent. Chairman Munsch called the meeting to order and everyone was asked to stand while he gave the invocation. Item 4: Approval of Minutes of March 15, 1990 Following discussion Commissioner Gross moved to approve the minutes of March 15, 1990. Commissioner Redford seconded the motion; motion carried (4-0) with Chairman Munsch and Commissioners Gross, Redford and Weaver voting in favor of the motion. PLATTING Item 5: Consider approval of a preliminary plat for Villages of Coppell, Phase III, located south of DeForest Road and east of Allen Road, at the request of Don Tipton Engineering. P&Z Coordinator Taryon Bowman introduced the item to the Commission. Ms. Bowman s%ated that this project is loea%ed on a 23.33 acre tract of land, and will permit 101 single-family structures. She further stated that the previous preliminary plat was approved by Council in Nove~r, 1989, with a t~pical lot size of 60 X 100 feet, and the plat before the Commission tonight represents a typical lot size of 50 X 100 feet. Ms. Bowman stated that the applicant is requesting two variances, as follows: 1) allow alleys to be placed as indicated, and 2) DRAFT to allow the street radius to be less than 425 feet (this would allow for the placement of Brentwood Drive) Ms. Bowman then stated that this plat represent 120 lots, as opposed to the previous plat of 101 lots. She further stated that staff has some concerns with this request, as follows: 1) 2) the alley that runs parallel to DeForest Road could pose a potential hazard, and staff would ask that the Developer consider installing a solid masonry wall or a liVing screening wall. variance #2 as shown on the plat, should be omitted from the variance requested, as this is an item that should be considered before the Board of Adjustment. Mr. Pat Atkins of Don Tipton Engineers was present to represent this item before the Commission. Following discussion Commissioner Weaver moved to approve the preliminary plat for Villagee of Coppell, Phase III, with the condition that the developer provide appropriate screening and barrier between the alley easement and DeForest Road on the north side of the property as determined appropriate by the City staff, and approving variances #1 and #3. Commissioner Redford seconded the motion; motion carried (4-0) with Chairman Munsch and Commissioners Gross, Redford and Weaver voting in favor of the motion. Item 6: Consider approval of a preliminary plat for Villages of Coppell, Phase IV, located at the southwest corner of DeForest Road and Allen Road, at the request of Don Tipton Engineers. P&Z Coordinator Taryon Bowman introduced the item to the Commission. Ms. Bowmen stated this plat represents 99 lots on 17.21 acres of land. The applicant is requesting approval of a preliminary plat with the following variances: 1) 2) that the alleys be required only where indicated on the plat, and that the minimum street radius be 425 feet. Ms. Bowman then stated that as discussed earlier, the second variance request should be deferred to the Board of Adjustment. Mr. Pat Atkins of Don Tipton Engineers was present to represent this item before the Commission. Following discussion Commissioner Weaver moved to approve the preliminary plat for Villages of Coppell, Phase IV, approving variance #3 only, and with the condition that the alley be added on Block A, between lots 3 and 14. Commissioner Gross seconded the motion; motion carried (4-0) with Chairman Munsch and replat. Mayor Wolf declared the public hearing open and asked for those persons who wished to speak against the proposed replat. Those persons speaking were Mr. James Zukauckas, 724 Parkway Blvd. Mr. Zukauckas indicated he had a question rather than opposition concerning the all brick masonry requirements on the houses. Mr. Sieb stated that this item had been previously discussed and had been resolved. Mayor Wolfe then asked for those persons who wished to speak against the proposed replat; there were none. The public hearing was declared closed. Following discussion by the Council, Councilman Robertson moved that the replat be approved as submitted. Councilman Thomas seconded; motion carried 7-0 with Mayor Pro Tem Smothermon and Councilmen Weaver, Thomas, Morton, Cowman, Robertson and Nelson voting in favor of the motion. Item 14. Consider approval of a preliminary plat for Villages of Coppell, Phase III, located south of DeForest Road and east of Allen Road, at the request of Don Tipton Engineering. Director of Planning & Community Services Gary Sieb made the presentation to the Council. The Planning & Zoning Commission has recommended unanimous approval of this plat with the condition that the developer provide appropriate screening and barrier between the alley easement and Deforest Road on the north side of the property. As determined appropriate by the city staff, showing alleys as depicted on the plat and minimum streets center line radius shown on the plat. The plat does contain two conditions which are 1) allow alleys to be placed as indicated on the plat 2) permit minimum street center line radius to be less than 425 feet to allow for the placement of Brentwood Drive. 3) appropriate screening and barrier between the alley easement and DeForest Road on the north side of the property, and 4) provision of an access easement on Lot 1 at the southeast intersection of Brentwood Drive and Allen Road. Mr. H. H. McGinnis who has property adjoining this development on the north side of Deforest Road was present to discuss drainage problems in his area with the Council. Mr. McGinnis stated that he felt this development would cause additional drainage problems on his property. Mr. Sieb indicated to the Council that all drainage items would be addressed prior to the final plat being brought forward to Council. Mr. Pat Atkins with Don Tipton Engineering, representing the applicant, was present and stated to the Council that it was the intent of the developer and the design of the plat to drain all areas in this development to the east. Following discussion on this item, Councilman Morton moved that the preliminary plat be approved subject to all drainage problems being remedied and that Mr. H. H. McGinnis be consulted and informed of any drainage issues. Councilman Thomas seconded the motion; motion carried 7-0 with Mayor Pro Tem Smothermon and Councilmen Weaver, Thomas, Morton, Cowman, Robertson and Nelson voting in favor of the motion. Item 15. Consider approval of a preliminary plat for Villages of Coppell, phase IV, located at the southwest corner of DeForest Road and Allen Road, at the request of Don Tipton Engineers. Director of Planning & Community Services Gary Sieb made the presentation to the Council. Mr. Sieb stated that the Planning & Zoning Commission recommended approval of the preliminary plat with approval of a minimum street center line radius less than 425 feet and, with the condition that the alley be added on Block A, between lots 3 & 14. Additional conditions being requested are 1) that the alley be required only where indicated on the plat; 2) minimum street radius to be less that 425 feet where as these Coppell subdivisions require a minimum distance of 425 feet, and; 3) appropriate screening and barrier be placed between the alley and DeForest Road. Following discussion on this item, Councilman Robertson moved that the preliminary plat be approved with the three conditions as indicated subject to all drainage being worked out prior to the final plat being presented back before Council. Page 6 of 12