Vlgs of C P3/FP-CS 910211February 11, 1991 TO= FROM: RE= COPPELL PUBLIC WORKS Taryon Bowman, Planning & Zoning Coordinator Shohre Daneshmand, Acting City Engineer ~ Final Plat; Villages of Coppell Phase III We have reviewed the engineering plans for Villages of Coppell Phase III as submitted to our office for general conformance to the City of Coppell Subdivision Ordinance and Standards. The following are our comments: - Minimum horizontal curvature per Subdivision Ordinance is 425 feet. Provide a formal request for variance to the Subdivision Ordinance. The recommended horizontal curvature, per the latest Thoroughfare Plan, is 300 feet. - Minimum pavement width for a C2U (60' R.O.W.) such as Allen Road is 40 feet. - The C factor must be 0.65 and the rainfall intensity I be 11.6 for 10 minutes. If Tc - 15 minutes is used, please provide justification and analysis. - Provide an off-site drainage area map, scale l" = 200' or 300'...etc. - Provide a design plan for an enclosed drainage system to handle off-site drainage from north side of Deforest Road. - Provide erosion control plan. - Show limits of 100 year floodplain and floodway on the final plat and drainage area map. - All provisions of the floodplain ordinance #87390 and the newly adopted city-wide storm water master plan must be complied with. We recommend that there be no loss in valley storage. - Appropriate development fees must be paid - SEE ATTACHED - Provide a written response on all comments with explanations provided on items not addressed as requested by staff. - A set of marked up plans and Public Works comments have already been provided to Don Tipton Engineering for correction. We have no objection to this project as long as all above comments are addressed. MSD/sm cc: Steven Goram, Director of Public Works Ben dela Cruz, Engineer Technician Public Works DRC Members Pat Atkins, Don Tipton Engineering VILLAGES OF COPPELL PHASE III DEVELOPMENT FEES Street Sign Assessment Street Light Assessment Park Fees 120 Lots @ $150.00 each (50% due at time of final plat approval) (50% due prior to building permit being issued paid by builder) Water Impact Fee (100% due prior to Council approval of final plat) Water Tap Inspection Fee (100% due prior to issuance of building permit) Sewer Impact Fee (100% due prior to Council approval of final plat) Sewer Tap Inspection Fee (100% due prior to issuance of building permit) Inspection Fee (2% of construction contract amount) * Provide estimated construction costs $1,661.28 $5,852.00 $18,000.00 $73,260.00 $11,100.00 $46,842.00 $11,100.00 COPPELL PUBLIC WORKS DATE: TO: FROM: HE: February 11, 1991 ~ J Shohre Daneshmand, Acting City Engineer Howard Pafford, Water Utilities Superintenden Water/Wastewater Fee Assessments for "Villages of Coppell Phase III" The following fees have been calculated for submittal to developer. Water Impact Fee 11I 5/8" x 3/4" meters = 11I E.S.U.'s 6660.00 each 100% due prior to Council approval' of final plat. $ 73,260. O0 Wastewater Impact Fee 111 5/8" x 3/4" meters = 111E.S.U.'s @422.00 each 100% due prior to Council approval of final plat. $46,842.00 Water Tap Inspection Fee 111 Connections 6100.00 each 100% due prior to issuance of Building Permit. $11,100.00 Sewer Tap Inspection Fee 111 Connections 6100.00 each 100% due prior to issuance of Building Permit. $11,100.00 HLP/mp PHASEIII.HLP COPPELL PUBLIC WORKS MEMORANDUM DATE = TO= FROM= RE= February 7, 1991 Shohre Daneshmand, Acting City Engineer Rick Wieland, Parks & Recreation Manager~ Developmental Fees - Villages of Coppell - Phase III Park Fees: Villages of Coppell - Phase III 120 Lots @ $150.00 each 50% Due at time of final plat approval 50% Due prior to building permits being issued, paid by builder(s) $18,000.00 Should you have any questions regarding this matter, please contact me. RSW/mp VILLCOPP.RSW SIGN The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pr-Lcing which is reviewed on a regular, basis. S I GF_~ UNIT PRICE QUANTITY EXTENDED PRICE io ,o, No Parking · :~ p ~ e d L i m .i. 't Y i.c ld .Stop S't~L4ee t Name S'{op & S kree'k Combo orfI-{E R .;,53 10 $63 54 *65 ].2 .,, ~].1 60 $96 85 TOTAL * Cost breakdowns may be obtained, from Public Works by written toques 't. Street Light Assessment The following assessment is being made in accordance with the City of Coppell. Subdivision Ordinance Appendix A Chapter VI, D. The following figures were supplied by T.P. & L. for estimating this assessment. $292.60 per light for every 200 feet of roadway. YOU are being assessed for to ~0 lights. ft. of roadway, which totals $292.60 x~P lights *Before lights are installed contact Public Works - Steve Goram, Director of Public Works or Per Birdsall, Street Foreman to have lighting plan approved.