Vlg at CC S5/FP-CS 960816Coppell, Texas 75019
I SKlll3I~E HORO
P.O. Box 478
Coppell, Texas 75019
214-462-0022
August 16, 1996
Tipton Engineering, Inc.
Attn: Mr. Pat Atldns
6330 Belt Line Road
Garland TX 75043
RE: Villaee at Cottonwood Creek, Section V, F'mal Plant
Gentlemen:
This letter is to inform you that, in action taken on Thursday, August 15, 1996, the Coppell
Planning and Zoning Commission has recommended approval of the final plat referenced above,
subject to engineering comments and compliance with the following conditions:
1) Correct zoning reference on Village at Cottonwood Creek, Section III, from "SF-0" to
"PD-147";
2) Correct zoning reference on Village at Cottonwood Creek, Section I, from "PD-SF-9"
to "SF-9";
3) Screening wall along Minyard Drive is required to block rear yard views;
4) Add a signature block for Lone Star Pipeline under the Utility Certificate signature
block; and
5) Submit elevations for any proposed attached subdivision entry sign.
A copy of engineering comments is attached.
The date scheduled for consideration by the City Council is Tuesday, September 10, 1996, at
7:30 p.m. A representative for this case must be present at this meeting. Failure to represent
this item may result in the denial of this application.
If you have any questions, please contact me at (214) 304-3675.
Sincerely,
l~ert Virtanen
Assistant Director of Planning & Community Services
encl: Development Review Committee Engineering Comments
cc: Isabelle Moro, P&Z Coordinator
Building Inspection
DEVELOPMENT R RVIEW COMMI EE
ENGINEERING COMMENTS
ITEM: Walaees o[ Cottonwood Cree~. Se_,~'on K ~ l~__. to ~ the
development of a $9-1at single famiO rexideng~ ~n on 16.8
acres of property, rotated on the northeast corner of Sandy take
and Coppell Roads, at the request of l~oton Engineering, Inc.
DR¢ DATE: July 25, 1996 and August 1, 1996
CONTACT: M'ti~ Martin, E.I.T., Assistant City Engineer 004-21679)
COMMENT STATUS:
I) Provide right-of-way clips at all street intersections for handicap ramps.
2) Need detail of common medians and note to be maintained by Homeowners Association.
3) After reviewing the construction plans, a 25' utility drainage easement is necessary in order
to construct the 60" R.C.P. and the 8" sanitary sewer line between lots 10 & 11 Blk A.
This is an informational comment and should have no bearing on the ap_oroval of the plcu;
1) Impact fees will be required.