Loading...
Vlg at CC S6/FP-DR 940825 mm m m TUELECTRIC Date Comments for the City of Coppell Development Review Committee ~~Preliminary/~ Plat is~acceptable. /~Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the eveloper. oad information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. ~/Other comments Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234