Loading...
Vlg at CC S6/FP-CS 941103TIPTON ENGINEERING, INC. ENGINEERING · SURVEYING ° PLANNING 4040 __ 6330 BeltLine Road · SuiteC ° Garland, Texas 75043 · (214) 226-2 November 3, 1994 Mr. Gary Sieb Director of Planning CITY OF COPPELL 255 Parkway Boulevard Coppell, Texas 75019 Re: VILLAGE AT COTTONWOOD CREEK, SECTION VI, FINAL PLAT COPPELL, TEXAS Dear Mr. Sieb: Please find listed below the responses to the Development Review Committee meetings which were held on October 27, 1994: PLANNING DEPARTMENT COMMENTS: o Street names have been changed as requested. All easements have been shown on the face of the plat. We have verified the building pad on Lot 1, Block D. We have noted on the plat the location of the Hike and Bike Trail. We have noted on the face of the plat a 6 foot solid masonry wall along Parkway Boulevard. II. FIRE DEPARTMENT COMMENTS: 1. We are providing new street names. Mr. Gary Sieb November 3, 1994 Page No. 2 III. BUILDING INSPECTION COMMENTS: 1. We have provided a screening wall/landscape easement on Lots 7, 8, 9, Block A. A call out for fence setback at Lot 6, Block F, has been provided. General Comment. A landscape and screening wall easement has been provided along Parkway Boulevard. Zoning has been called out. IVo LONE STAR GAS COMMENTS: 1. We have provided the 5' easement along Parkway Boulevard. Ve TU ELECTRIC COMMENTS: We are providing a 10' utility easement along North Row of Parkway Boulevard and one (1) 20 x 20 switch gear easement along Parkway. VI. ENGINEERING COMMENTS - FINAL PLAT: We will be providing offsite right-of-way for the alley radius from Bonham Bank. Mr. Gary Sieb November 3, 1994 Page No. 3 2. All easements are shown on the face of the plat. o There were no separate easements provided by volume and page. All new easements will be replatted in accordance with the design documents. We have provided an additional wall easement width at the eastern side of this plat to show transition to the proposed screening wall for Copper Stone. The sight visibility at the intersection of Gifford and Parkway Boulevard is in compliance with Subdivision Regulations. The area adjacent to Lot 13, Block A is labeled as a common area. We have shown minimum finish floor elevations of 2 feet above the existing floodplain or 1 foot above the ultimate floodplain on the plat for Lots 58-71, Block A. We are in the process of obtaining offsite easements. We are in the process of obtaining offsite easements. 10. Escrow will be provided for Coppell Road. Mr. Gary Sieb November 3, 1994 Page No. 4 This concludes our review of staff comments. If you have any questions or if we can furnish on, do not hesitate to contact our office. Pat'~Atkins President PA:ea Attachments