Loading...
Vlgs of C P4/PP-AG 900508AGENDA REQUEST FORM THE CITY WITH A ~E~UTIFUL FUTURE CITY COUNCIL MEETING May 8, 1990 ITEM NO. ITEM CAPTION: Phase IV, located at the southwest corner of DeForest Road and Allen Road, at the request Tipton Engineers. SUBMITTED BY: Consider approval of a preliminary plat for Villages of Coppell~,. f Don STAFF ~.:Gary n. Sieb.~lanninq D~r~ OTHER ~ Wo~rks Department DATE: EVALUATION OF ITEM: Date of Planning and Zoning Commission: April 19, 1990 Decision of Planning and Zoning Commission: Approved (4-0) with approval of a minimum street centerline radius less than 425 feet and with the condition that the alley be added on Block A, between Lots 3 and 14. Applicant is requesting approval of a preliminary plat and the following conditions: 1. alleys be required only where indicated on the plat, and 2. minimum street radius to be less than 425 feet. (Comprehensive Subdivision Ordinance requires a minimum distance of 425 feet). Please see attached staff report for further details. BI. GET AMT.: COF~fENTS: AMT. ESTIMATED: A PPRO VED BY CITY COU/N ?,IL DATE ~/,~ ~ o FINANCIAL REVIEW BY: LEGAL REVIEW BY: AGENDA REQ FORM. 0588DS REVIEWED BY CM: CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT Villa.~es of Coppell, Phase IV, Preliminary, Plat P & Z HEARING DATE: April 19, 1990 C. C. HEARING DATE: May 8, 1990 LOCATION: At the southwest corner of DeForest Road and Allen Road, on 17.21 acres. REQUEST: Approval of a preliminary plat along with the following variances as requested: 1) Alleys be required only where indicated on the plat. 2) Minimum street radius to be less than 425 feet. (Comprehensive Subdivision Ordinance requires a minimum distance of 425 feet). SIZE OF AREA: 17.21 acres APPLICANT: Don Tipton Engineers 6330 Beltline Road, Suite C Garland, Texas 75043 ANALYSIS: The applicant is requesting approval of a preliminary plat along with variances. The preliminary plat as submitted, is acceptable. The Public Works Department has concerns about the use of ten (10) foot right-of-way dedication along DeForest Road. The Parks Department has concerns regarding the use of common areas in the abutting subdivision (Villages of Coppell, Phase II), for the disposition of storm water discharge. ALTERNATIVES: 1) Approve the preliminary plat 2) Deny the preliminary plat ATTACHMENTS: 1) Preliminary plat ITEM 6 VLG4STF 2) DRAFT to allow the street radius to be less than 425 feet (this would allow for the placement of Brentwood Drive) Ms. Bowman then stated that this plat represent 120 lots, as opposed to the previous plat of 101 lots. She further stated that staff has some concerns with this request, as follows: 1) 2) the alley that runs parallel to DeForest Road could pose a potential hazard, and staff would ask that the Developer consider installing a solid masonry wall or a living screening wall. variance #2 as shown on the plat, should be omitted from the variance requested, as this is an item that should be considered before the Board of Adjustment. Mr. Pat Atklns of Don Tipton Engineers was present to represent this item before the Commission. Following discussion Commissioner Weaver moved to approve the preliminary plat for Villages of Coppell, Phase III, with the condition that the developer provide appropriate screening and barrier between the alley easement and DeForest Road on the north side of the property as determined appropriate by the City staff, and approving variances #1 and #3. Commissioner Redford seconded the motion; motion carried (4-0) with Chairman Munsch and Commissioners Gross, Redford and Weaver voting in favor of the motion. Item 6: Consider approval of a preliminary plat for Villages of Coppell, Phase IV, located at the southwest corner of DeForest Road and Allen Road, at the request of Don Tipton Engineers. P&Z Coordinator Taryon Bowman introduced the item to the Commission. Ms. Bowman stated this plat represents 99 lots on 17.21 acres of land. The applicant is requesting approval of a preliminary plat with the following variances: 1) z) that the alleys be required only where indicated on the plat, and that the minimum street radius be 425 feet. Ms. Bowman than stated that as discussed earlier, the second variance request should be deferred to the Board of Adjustment. Mr. Pat Atkins of Don Tipton Engineers was present to represent this item before the Commission. Following discussion Commissioner Weaver moved to approve the preliminary plat for Villages of Coppell, Phase IV, approving variance #3 only, and with the condition that the alley be added on Block A, between lots 3 and 14. Commissioner Gross seconded the motion; motion carried (4-0) with Chairman Munsch and  ~Commissioners, Gross, Redford and Weaver voting in favor of the motion. Item 7: Consider approval of a replat for Meadows Addition, Section 2, Block J, Lots 1 & 2, and Block B, Lot 18, located at the northwest and southwest corner of Meadow Run and Woodmoor Drive, at the request of Meadowglen Properties. P&Z Coordinator Taryon Bowman introduced the item to the Co~mission. MS. Bowman stated that this request is a replat of four single-family lots on a total of 4.74 acres of land. She stated that the lots were included in the rezoning of PD-105, with a typical lot size of 8,415 square feet, with a minimum dwelling size of 1750 square feet. Ms. Bowman stated that on Block 3, lots 1 and 2 the lots were previously platted several years ago; however, a portion of that was never platted. She further stated that if this request is approved, they will be required to follow the development guidelines for PD-105. Ms. Bowman then stated that staff recommends approval of this request. Mr. Bill Anderson of Dan Dowdey and Associates was present to represent this item before the Commission. Chairman Munsch then opened the public hearing and asked for persons wishing to speak in opposition to this request. Those persons speaking were: Willford Benson Glen Hinckley Alan Grooms 141Lansdowne Developer (not in opposition) 124 Meadowglen Circle He then asked for persons wishing to speak in favor of the request. There were none. The public hearing was then declared closed. Following discussion Commissioner Redford moved to approve the replat for Meadows Addition, Section 2, with the condition that the City add the restrictions of the original platting requirements. Commissioner Gross seconded the motion; motion carried (4-0) with Chairman Munsch and Commissioners Gross, Redford, and Weaver voting in favor of the motion. Item 8: Consider approval of a replat for Meadows Addition, Section 3, Block J, Lots 3-7, located at the intersection of Meadow Run Drive and Lockhaven Lane, at the request of Meadowglen Properties. P&Z Coordinator Taryon Bowman introduced the item to the Commission. Ms. Bowman stated this replat is a development of five lots on 1.115 acres of land, and were also included on been resolved. Mayor Wolf then asked for those persons who wished to speak against the proposed replat; there were none. The Public hearing was declared closed. Following discussion by the Council, Councilman Robertson moved that the replat be approved as submitted. Councilmen Thomas seconded; motion carried 7-0 with Mayor Pro Tem Smothermon and Councilman Weaver, Thomas, Morton, Cowman, Robertson and Nelson voting in favor of the motion. Item 14. Consider approval of a preliminary plat for Villages of Coppell, Phase III, located south of DeForest Road and east of Allen Road, at the request of Don Tipton Engineering. Director of Planning & Community Services Gary Sieb made the presentation to the Council. The Planning & zoning Commission has recommended unanimous approval of this plat with the condition that the developer provide appropriate screening and barrier between the alley easement and Deforest Road on the north side of the property. As determined appropriate by the city staff, showing alleys as depicted on the plat and minimum streets center line radius shown on the plat. The plat does contain two conditions which are (1) allow alleys to be placed as indicated on the plat and, (2) aermit minimum street center line radius to be less than 425 feet to allow for the placement of Brentwood Drive. Mr. H. H. McGinnis who has property adjoining this development on the north side of Deforest Road was present to discuss drainage problems in his area with the Council. Mr. McGinnis stated that he felt this development would cause additional drainage problems on his property. Mr. Sieb indicated to the Council that all drainage items would be addressed prior to the final plat being brought forward to Council. Mr. Pat Adkins with Don Tipton Engineering, representubg the applicant, was present and stated to the Council that it was the intent of the developer and the design of the plat to drain all areas in this development to the east. Following discussion on this item, Councilman Morton moved that the preliminary plat be approved subject to all drainage problems being remedied and that Mr. H. H. McGinnis be consulted and informed of any drainage issues. Councilman Thomas seconded the motion; motion carried 7-0 with Mayor Pro Tem Smothermon and Councilmen Weaver, Thomas, Morton, Cowman, Robertson and Nelson voting in favor of the motion. Item 15. Consider approval of a preliminary plat for Villages of Coppell, phase IV, located at the southwest corner of DeForest Road and Allen Road, at the request of Don Tipton Engineers. Director of Planning & Community Services Gary Sieb made the presentation to the Council. Mr. Sieb stated that the Planning & Zoning Commission recommended approval of the preliminary plat with approval of a minimum street center line radius less than 425 feet and, with the condition that the alley be added on Block A, between lots 3 & 14. Additional conditions being requested are 1) that the alley be required only where indicated on the plat; 2) minimum street radius to be less that 425 feet where as these Coppell subdivisions require a minimum distance of 425 feet, and; 3) Appropriate screening and barrier be placed between the alley and DeForest Road. Following discussion on this item, Councilman Robertson moved that the preliminary plat be approved with the three conditions as indicated subject to all drainage being worked out prior to the final plat being presented back before Council. Mayor Pro Tem Smothermon seconded the motion; motion carried 7-0 with Mayor Pro Tem Smothermon and Councilmen Weaver, Thomas, Morton, Cowman, Robertson and Nelson voting in favor of the motion. Item 16. Director presentation to the Consider approval of a final plat for Pecan Hollow Addition, located approximately 550' south of the southwest corner of Parkway Boulevard and Lodge Road, at the request of Gateway U.S.A. of Planning & Community Services, Gary sieb, made the Council. Mr. Sieb stated that the Planning & /