Loading...
Vlgs of C P4/FP-CS 910211COPPELL PUBLIC WORKS MEMORANDUM February 11, 1991 TO: Taryon Bowman, Planning & Zoning Coordinator FROM .' RE: Shohre Daneshmand, Acting City Engineer ~ Final Plat - Villages of Coppell; Phase IV We have reviewed the engineering plans for Villages of Coppell Phase IV as submitted to our office for general conformance to the City of Coppell Subdivision Ordinance and Standards. The following are our comments: Minimum horizontal curvature, per Subdivision Ordinance, is 425 feet. Provide a formal request for variance to the Subdivision Ordinance. The recommended minimum horizontal curvature per the latest thoroughfare plan is 300 feet. The C factor for storm sewer design must be 0.65 and the rainfall intensity I be 11.6 for minimum time of concentration (Tc) of 10 minutes. If Tc = 15 minutes is used, please provide justification. Provide an off-site drainage area map scale 1" = 200' or 300'..., etc. Provide drainage area map for any off-site drainage. Provide erosion control plan. Show limits of 100 year floodplain on the final plat & drainage area map, if applicable. Ail provisions of the floodplain ordinance #87390 and the newly adopted City-Wide Storm Water Master Plan must be complied with. We recommend that there be no loss in valley storage. Appropriate development fees must be paid - SEE ATTACHED Provide a written response on all comments with explanations provided on items not addressed as requested by staff. A set of marked up plans and Public Works comments have already been provided to Don Tipton Engineers for correction. We have no objection to this project as long as all above comments are addressed. MSD/sm cc: Steven Goram, Director of Public Works Ben dela Cruz, Engineer Technician Public Works DRC Members Pat Atkins, Don Tipton Engineering VILLAGES OF COPPELL, PHASE IV DEVELOPMENT FEES Date: February 11, 1991 Street Sign Assessment Street Light Assessment Park Fee Assessment 90 Lots @ $150.00/ each (50% due at time of final plat approval) (50% due prior to building permits being issued paid by builder) Water Impact Fee (100% due prior to Council approval of final plat) Water Tap Inspection Fee (100% due prior to issuance of building permit) Sewer Impact Fee (100% due prior to Council approval of final plat) Sewer Tap Inspection Fee (100% due prior to issuance of building permit) Inspection Fee: (2% of construction contract amount) * Provide estimated construction costs $1,144.06 $559.40 $13,500.00 $59,400.00 $9,000.00 $37,980.00 $9,000.00 DATE = TO= FROM= COPPELL PUBLIC WOHK$ February I1, 1991 V / Shohre Daneshmand, Acting City Engineer ,~A\ Howard Pafford, Water Utilities Superintende~ Water/Wastewater Fee Assessments for "Villages of Coppeli Phase IV" The following fees have been calculated developer. Water Impact Fee 90 5/8" x 3/4" meters = 90 E.S.U.'s 6660.00 each 100% due prior to Council approval of final plat. Wastewater Impact Fee 90 5/8" x 3/4" meters = 90 E.S.U.'s 6422.00 each 100% due prior to Council approval of final plat. Water Tap Inspection Fee 90 Connections 6100.00 each 100% due prior to issuance of Building Permit. Sewer Tap Inspection Fee 90 Connections 6100.00 each 100% due prior to issuance of Building Permit. HLP/mp for submittal to $59,400.00 $3 7,980. O0 $ 9,000.00 $ 9,000.00 PHASEIV.HLP COPPELL PUBLIC WORKS MEMORANDUM DATE = TO: FROM: RE: February 8, 1991 Shohre Daneshmand, Acting City Engineer Rick Wieland, Parks & Recreation Manager~ Developmental Fees - Villages of Coppell - Phase IV Park Fees: Villages of Coppell - Phase IV 90 Lots @ $150.00 each 50% Due at time of final plat approval 50% Due prior to building permits being issued, paid by builder(s) $13,500.00 Should you have any questions regarding this matter, please contact me. RSW/mp VILLCOPP.RSW The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular, basis. UNIT PRICE QUANTITY EXTENDED PRICE No Parking Speed L J. mJ.t Y ic ld ,Stop .~.eat Name SL'op & Street Combo OTIIER % · ;,53 10 $63 5d $65 12 :,q ]. 1 60 e'96 85 Cost breakdowns may be obtained, from Public Works by written r e (.l u e s 't. Street Light Assessment for The following assessment is being made in accordance with the City of Coppell. Subdivision Ordinance ApPendix A Chapter VI, D. The following figures were supplied by T.P. & L. for estimating this assessment. $292.60 per light for every 200 feet of roadway. You are being assessed for ~O(~ to Iq lights. ft. of roadway, which totals $292.60 x ~ lights *Before lights are installed contact Public Works - Steve Goram, Director of Public Works or Per Birdsall, Street Foreman to have lighting plan approved.