Loading...
Vlg at CC P6/Re-DR 950323 (4)DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITI~M: l~age at Cottonwood Creek Section VI, Replot of Lots 19-36 and 45 & 46, to add a ,_:~_n_~ easement strip between lots 19 & 29, a street between lots 26 & 27 and to clumge the alley conJ~,uration between lots 34 & $$ and lots 45 & 46 located at the intersection of C, raywood Lane and Pedmore Drive, at the request of l~ton Engineering, Inc. DRC DATE: March 23, 1995 & March $0, 1995 CONTACT: Ken Ca, tiffin, P.E., Assistant City Manager/Ci~ Engineer 004-3679) COMMENT STATUS: ~ INITIAL .m'~' .~,..,..,... 'a"~' ~ ,.~.. ov ~ Platting Comments: 1. The signature block for the floodplain administrator should be provided. 2. The adjacent zoning should be shown. 3. This replat is creating an alley length in excess of 2000 feet. As has previously been stated, this is too long and an intermediate alley connection to the street should be provided at approximately the mid-point. 4. You need to offset the proposed extension of Hampton Drive by 125 feet from the existing street so the street does not function as a collector street. Developer Information Comments: Based on our conversations, there appears to be an inability to obtain proper easements from Mr. Adams property to construct this subdivision as previously submitted. It is my understanding that there will probably be an additional plat to eliminate several lots and create a slope easement. Would it not be better to withdraw this plat and submit just one replat that would accomplish the entire item.