Vlg at CC P6/Re-DR 950323 (7)"flIELECTRIC
Date
Comments for the City of Coppe11
Development Review Committee
~iz~minar¥iFin~ for
Preliminary/Final Plat is not acceptable.
Easements will be required for proposed electric facilities.
A plat with easement requirements will be provided to the
developer.
Load information (size of structure, A/C / Heat Load) will
be required from the developer before easements can be
determined.
ther comments [, ,~
Please call me at 214-888-1307 if you have any questions.
Tim Brancheau
14400 losey Lane Farmers Branch, Texas 75234