Loading...
Vlg at CC P6/Re-DR 950323 (7)"flIELECTRIC Date Comments for the City of Coppe11 Development Review Committee ~iz~minar¥iFin~ for Preliminary/Final Plat is not acceptable. Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. ther comments [, ,~ Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14400 losey Lane Farmers Branch, Texas 75234