Loading...
Vistas of C P1B/FP-DR 970529(6)Date / / T ELEC TRIC Comments for the City of Coppell Development Review Committee ~r-~/Final Plat for P~/Final Plat is ~C acceptable. Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. ~/Other comments b~ ~ ~O~;~ \AJ ( C.--(--~ ~> ~::__ / Please call me at ~4-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234