Loading...
Waterside P2/PP-CS 850508 (2)ae Be Date: Rev. No: 5-8-85 0 DEVELOPMENT IMPACT ANALYSIS Waterside Estates No. 2 General 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Development Name and size: 42.14 acres Owner: Triland Development Co. Engineer: Nathan Maier Current zoning: SF Current status of development: Final plat Location: N Parkway Blvd. E MacArthur Blvd. Proposed density: 3 lots/acre Annexation or land study required: N/A Issues resolved: N/A Issues to be resolved: N/A Dedications required: none Impact 1. Traffic: a. Off-site collector streets: Parkway Blvd. 600 vpd b. Off-site arterial streets: MacArthur Blvd. 1200 vpd 2. Sewer: a. Proposed mains: b. Proposed connections to existing mains: 27" MUD line, Parkway Blvd. 3. Water: Connect 12" main at Parkway 4. Drainage or Flow: To interior lake 5. Schools: a. Primary school: 100 students b. Middle school: 50 students C. Approvals and Fees Fees: Item list)_ _ Fees Required (when required) 2. Assessments and Pro Rata Charges: Paid to date ae Item: Streets Summary: None be Item: Street Lights Summary: To be determined Ce Item: Street Signs Summary: 13 signs @ $143.75 = $1,869.00 Approvals a. Annexation b. Land study: P&Z, City Council c. Zoning: P&Z, City Council d. Preliminary Plat: City Engineer: Planning & Zoning: City Council: e. Final Plat City Manager: City Engineer: Planning & Zoning: City Council Construction Plans: City Manager: City Engineer: File approved plat: Letter of acceptance: Receive as-builts: End of warranty period: fe ge 5-8-85 5-16-85