Loading...
Waterside P3/PP-AG 920310 AGENDA REQUEST FORM The C~ W~ ^Beautiful ~u~ CITY COBOL ~R~NG ~h 10, 1992 I~ ~~ ~ ~ ITEM CAPTION: Considerati°nand approval of a preliminary plat for Waterside Estates, Phase Ill, located at the northwest corner of MscArthur BOUlevard and Parkway Boulevard, at the request of Standard Pacific. · SUBMITTED BY: Date of P & Z Meeting: Decision of P & Z Commission: STAFF REP.: Planning Dix~ctor, Gary L. Sieb OTHER REP.: DATE: February Z0, 1992 Approved [B--0] with the following conditions: l.] that the applicant close the existing median cut on MacArthur BOulevard, and 2.) that the developer include the wrought-iron fence along the lake APPROVED BY DAC IY COL IL Please see attached staff report for further details.' BUDGET AMT. AMT +/- BUDGET cOMMENTS: AMT. ESTIMATED FINANCIAL REVIEW BY - LEGAL REVIEW BY: AGENDA REQUEST FOP,~M ~ 1/91 REVIEWED BY Cid: ~ CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT WATERSIDE ESTATES, PHASE III, PRELIMINARY PLAT P & Z HEARING DATE: February 20, 1992 C. C. flEARING DATE: March 10, 1992 LOCATION: At the northwest corner of MacArthur Boulevard and Parkway Boulevard. SIZE OF AREA: 12 Acres REQUEST: Approval of a preliminary plat along with the following considerations: 1) 2) 3) Lots 1-15, Block G, (lots adjacent to the existing lake), be approved with no alleys. Allow a minimum center-line street radius of 150'. Permit a median opening with left turn lane in MacArthur Boulevard, at 285' from Allen Road [measured from center-line to center-line). APPLICANT: Standard Pacific Homes 5525 MacArthur Blvd. Irving, TX 75038 [214) 550-0426 Mr. Bill Anderson [Engineer) Dan Dowdey & Associates 16250 Dallas Parkway #100 Dallas, TX 75248 [214) 931-0694 HISTORY: No recent activity on this parcel. TRANSPORTATION: This is adequately served by Boulevards. Parkway and MacArthur SURROUNDING LAND USE & ZONING: North - vacant; PD-SF-9 South - single-family detached; PD-SF East - vacant; proposed PD-SF-7 West - vacant; SF-9 ITEM 9 ANALYS I S: Three special considerations have been requested for this development including: 1) hots 1-15, Block G, (lots adjacent to the existing lake), be approved with no alleys. STAFF COMMENT: The Comprehensive Subdivision Ordinance states that alleys must be provided for in all subdivisions. However, it has become customary for the City to grant approval for the deletion of alleys for lots abutting creeks and lakes. 2) Minimum center-line street radius of 150'. STAFF COMMENT: The Comprehensive Subdivision Ordinance suggests a minimum center-line street radius of 450'. However, the Engineering department has no objections to this request, mainly due to the limitations of this small parcel and its location, which is bound by two existing roadways. 3) Permit a median opening with left turn lane in MacArthur Boulevard, at 285' from Allen Road (measured from center-line to center-line). STAFF COMMENT: For a major arterial such as MacArthur Boulevard, this request is not in conformance with Coppell's Roadway Functional Classification and Design standards. The recommended median opening spacing is 500', with a desirable spacing of 530'. However, the suggested opening spacing minimum is 300'. Therefore, we recommend denial of a median opening at this location. In summary, staff has no objections to approval of the preliminary plat, however, we recommend denial of the request for the median opening with a left-turn lane. ALTERNATIVES: 1) Approve the preliminary plat 2) Deny the preliminary plat 3) Modify the preliminary plat ATTACHMENTS: 1) Preliminary Plat WTRSD3.STF number 91500-A-16. Councilman Morton seconded the motion. The motion was tied 3-3 with Councilmen Morton, Robertson and Nelson voting in favor of the motion, and Councilmen Weaver, Thomas and Cowman denying the motion. The motion carried 4-3, with Mayor Wolfe breaking the tie by voting in favor of the motion. Mayor Pro Tem Smothermon rejoined the Council at this time. Item 22 Authorization to enter into a contract with F&S Partnership to design the Coppell Public Library with compensation for basic services not to exceed 8% of the construction cost of the facility or $181,600.00, whichever is less, and authorizing the Mayor to sign. Council Member Morton moved to approve authorization to enter into a contract with F&S Partnership to design the Coppell Public Library with the compensation for basic services not to exceed 8% of the construction cost of the facility or $181,600.00, whichever is less. Councilman Robertson seconded the motion. The motion carried 7-0, with Mayor Pro Tem Smothermon and Councilmen Weaver, Thomas, Morton, Cowman, Robertson and Nelson voting in favor of the motion. Item 23 PUBLIC HEARING: Consideration and approval of a zoning change, Case #ZC-535 (Waterside Estates, Phase III), from (TH-i) Town House-l, to (SF-7) Single-Family-7, to allow construction of single-family homes, located at the northwest corner of Parkway Boulevard and MacArthur Boulevard, at the request of Standard Pacific. Director of Planning, Gary Sieb made the presentation to the Council and recommended approval. Mayor Wolfe declared the Public Hearing open and asked if there were any persons who wished to speak in favor of this proposal. There were none. He then asked for those person who wished to speak against the proposal. Again, there were none. Mayor Wolfe declared the Public Hearing closed. Mayor Pro Tem Smothermon moved to approve the zoning change of Case #ZC-535 (Waterside Estates, Phase III), from (TH-I) Town House-l, to (SF-7) Single-Family-7, to allow construction of single-family homes, located at the northwest corner of Parkway Boulevard and MacArthur Boulevard, at the request of Standard Pacific. Councilman Morton seconded the motion. The motion carried 7-0, with Mayor Pro Tem Smothermon and Councilmen Weaver, Thomas, Morton, Cowman, Robertson and Nelson voting in favor of the motion. Item 24 Consideration and approval of a preliminary plat for Waterside Estates, Phase III, located at the northwest corner of MacArthur Boulevard and Parkway Boulevard, at the request of Standard Pacific. Council Member Cowman moved to approve the preliminary plat for Waterside Estates, Phase III, located at the northwest corner of MacArthur Boulevard and Parkway Boulevard, at the request of the Coppell Independent School District with the following conditions: 1) that the applicant close the existing median cut on MacArthur Boulevard, and 2) that the developer include the wrought-iron fence along the lake, and 3) to waive the alley requirement along canals. Councilman Morton seconded the motion. The motion carried 7-0, with Mayor Pro Tem Smothermon and Councilmen Weaver, Thomas, Morton, Cowman, Robertson and Nelson voting in favor of the motion. EXECUTIVE SESSION (Closed to Public) Item 5-ES A. Article 6252-17, Section 2 (f), discussion concerning the negotiating position of the City with respect to agreements involving interests in land and the value of real property. ~ 1. Grapevine Trunk Sewer Line Article 6252-17, Section 2 (e), Senate Concurrent Resolution Number 83, discussion with City Attorney concerning matter involving privileged communications between attorney and client. CM031092 Page 7 of 12