Loading...
Wellington Pl/FP-CS 861016NDM NATHAN D. MAIER CONSULTING ENGINEERS, October 16, 1986 Mr. Ed Powe11 City Engineer P.O. Box 478 Coppell, TX 75019 Re: Riverchase NDM No.: 84-3-010.A Dear Mr. Powell: On behalf of Riverchase Joint Venture, we have reviewed the plans sub- mitted by McNamara Engineering Company for the Wellington Place off-site drainage. These plans are dated December 10, 1985, and were revised May 14, 1986, August 5, 1986, and October 9, 1986. The drainage system crosses Rlverchase at the western boundary in a 20- foot easement. The proposed system minimizes the impact on the Rlverchase Development and will not interfere with their development plans. A maintenance agreement is being prepared, defining responslbllty for maintenance of the system. Very truly yours, EAN/rdp NATHAN D. HAIER CONSULTING ENGINEERS, INC. ~ yer, ~ cc: Ed Fields Mike Daniels McNamara Engineering Co. Three NorthPark/8800 N. Central Expw¥./Sulte 300/Dallas, Texas 75231/(214).