Vistas of C P2C/FP-DR 970529(4)Date
"~'~ELECTRIC
Comments for the City of Coppell
Development Review Committee
~-~=~a~y/Final Plat for
/ ~/Final Plat is~e~ acceptable.
Easements will be required for proposed electric facilities.
A plat with easement requirements will be provided to the
developer.
Load information (size of structure, A/C / Heat Load) will
be required from the developer before easements can be
determined.
Other comments ~~~-- pO/d-d.- ~ ~r)'~{ ~0~ ~
/
Please call me at 2~4-888-1307 if you have any questions.
Tim Brancheau
14400 Josey Lane Farmers Branch, Texas 75234