Westbury Mnr/PP-DR 980226 (2)DEVELOPMENT REVIEW COM till:TEE
ENGINEERING COMMENTS
ITEM: Westbu~_ Manor. Prelimina~_ Plat to allow the development of a 39-1ot
residential subdivision on a 9. 713 acre tract of land located along the east
side of Heartz Road, and on the south side of Sandy Lake Road, at the
request of Ryland Group, Inc.
DRC DATE: February 26, 1998 and March 5, 1998
CONTACT: Mike Martin, P.E., Assistant City Engineer (304-3679)
COMMENT STATUS: ,,"PRELIMINARY FtNA:g
Due to the length of London Way and the connection to Heartz Road and Sandy Lake Road some
type of traffic calming devices need to be provided.
This development will need to install sidewalks along west side of London Way adjacent to the church
property.
3. Provide an 8' wide brick paver band for the street intersecting Heartz Road and Sandy Lake Road.
4. Turn the alley between Lots 1 and 2, Block 1 and eliminate the current alley connection to Sandy
Lake Road.
5. Sidewalk along Sandy Lake should be coordinated in location, elevation, and width with the Sandy
Lake Road Plans.
6. The correct visibility easement should be shown as per the City's Subdivision Ordinance.
7. All utilities and drainage easements for City utilities must be minimum of 20' wide as per the
Subdivision Ordinance.
8. What is the drainage system that discharges to Sandy Lake tying into? Proposed system will not be
in until late 1998 or 1999.
9. Does City of Coppell own land south of this development?