Loading...
Westbury Mnr/PP-DR 980226 (4)~ELECTRIC Comments for the City of Coppell Development Review Committee Preliminary/~ Plat for Date ~/J Preliminary/~l Plat is'~ acceptable. -~ Easements will be required for proposed electric/gas facilities. A plat with easement requirements will be provided to the developer. ,.,//Load information (size of structure, A/C, heat load) will be required from the developer before easements can be determined. ~ Other comments ~ /~ Please call me at 972/888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234