Loading...
Westbury Mnr/PP-DR 980430 (6)II II, ELECTRIC Comments for the City of Coppell Development Review Committee Preliminary/F'ir~Plat for Date ~/ Preliminary~Plat is,al~acceptable. V/Easements will be required for proposed electric/gas facilities. A plat with easement requirements will be provided to the developer. C Load information (size of structure, A/C, heat load) will be required from the ~/fioeVeloper before easements can be determined. ther comments ~ /' ~ Please call me at 972/888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234