Loading...
Nlake WE P10B/FP-CS 940316COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: 1. /dm CC: March 16, 1994 Gary Sieb, Director of Planning and Community Services Public Works Staff~ Preliminary Plans Comments - Northlake Woodlands East Phase 10B The developer will be responsible for the installation of traffic control devices to be consistent with The Texas Manual on Traffic Control Devices at the termination point of Bethel School Road and Willett Drive. Need 2" blow-offs on dead ends. Water valves to be moved as indicated on plans. Landscape screening wall and sidewalk construction must conform to City of Coppell standards. After construction, utility finals inspections will be made and any discrepancies will be required to be corrected before final acceptance. Park Dedication Ordinance will be required at final plat; i.e., 89 lots at $1,285.00. Ken Griffin, P.E., City Engineer Central File PLANS. NLAKEW 10