Loading...
Westfork Add/FP-CS 880517HENNE SEY ENGINEERING, INC. 1409 THIRD STREET · CARROI. LTON, TEXAS 75006 * (214) 245-9478 May 17, 1988 Mrs. Taryon Bowman Planning & Zoning Coordinator City of Coppell Planning Dept. Coppell, Texas Re= Westfork Addition - Job 8714 Dear Taryon= The following is a list of estimated construction costs for the above referenced 5 lot residential subdivision= 8m Water Boring Under Paving 5 Water Services Total Water 8" Sanitary Sewer Boring Under Paving 5 Sanitary Sewer Service Total Sewer Concrete Paving Doggett Cove Total Paving Total Very truly yours, $ 5,100.00 2,820.00 1~500.00 $ 9,420.00 7,000.00 3,300.00 lrS00.00 $11,800.00 $15r482.25 $15~482.25 $36,702.25 Pete Hennessey, P.E. President PH/j t D92al STRUCTURAl. CIVIL PLANNING · SURVEYING