White Glove/FP,Re-DR 970529 (5) I 1
"I~ELECTRIC
Comments for the City of Coppell
Development Review Committee
Date
Preliminary/Final Plat for
V/ ?rcliminary/Final Plat is ~ acceptable.
Easements will be required for proposed electric facilities.
A plat with easement requirements will be provided to the
developer.
Load information (size of structure, A/C / Heat Load) will
be required from the developer before easements can be
determined.
Other comments
Please call me at 2/4-888-1307 if you have any questions.
Tim Brancheau
14400 Josey Lane Farmers Branch, Texas 75234