Loading...
Willowood P2/PP-CS 771121FOX[ JaCOBS November 21, 1977 City of Coppell P.O. Box 478 Coppell, Texas 75019 Attn: Planning Commission Re: Willowood Preliminary Plat Gentlemen: Herewith are three (3) prints of the preliminary plat for your review and approval. We understand that our request for change in zoning will be heard on December 1, 1977; we would appreciate review of the preliminary plat at that time. Ail streets and alleys will be reinforced concrete, per City standards. Preliminary engineering plans indicate the utility lay out will be as follows: Water The water system will consist of a 12" main from the existing 8" main in Bethel School Road northeasterly along Park Lane; then northerly along Reunion Drive and dead ending at the North Property Line. 8" mains will be installed from the existing main in Heartz Road; east in Woodhurst Drive; north and easterly along Willow Springs Drive; and from Reunion Drive east along Willow Lane to Moore Road. An 8" main will also be installed in Moore Road along the limits of our East Property Line. The remainder of the water mains will be 6". All mains will be installed in accordance with City standards. Sanitary Sewer The sewer system will connect to an existing 10" main in Bethel School Road, just east of Rocky Branch Lane. A 10" main will be constructed northward in an easement along the eastern edge of the proposed park site, to approximately the intersection of Park Lane and Reunion Drive. The remainder of the mains will be 6" and 8" as grades and number of users dictate. The only critical area will be the 35 lots in Block 11 along Moore Road. This area will be served by an 8" main along the south alley of Block 9 and Reunion Drive. Contr. 28005u~eyor Blvd. / P. 0 Box934, Carrollton, Texas75006(214}242-6561 / BUILDERS OF t City of Coppell Planning Commission Re: Willowood Preliminary Plat Page 2 Ail mains will be constructed according to current City standards. Storm Sewer The majority of run off will be handled in streets, alleys and greenbelt areas, however, there will be a small amount of storm sewer in Willow Lane from Reunion Drive east to the greenbelt area. It is our intent to utilize and maintain natural drainage courses as much as possible. The engineer for this project will be John C. Gibson Company, Inc. any additional information is required, contact my office and/or my engineers office at your convenience. If Very truly yours, FOX & JACOBS, INC. M. L. Mitchell, P.E. Land Process Administrator MLM: jm Eric 1.