Windsor Est/FP-DR 990401DE VEL OPMENT RE VIE W COMMITTEE
BUILDING INSPECTION COMMENTS
DRC DATE: April 1, 1999
CONTACT: Greg Jo,~s, Chief Building Offidal (304-3500)
COMMENT STATUS:
1. Sidewalk at pond common area will need to be constructed wi~ subdivision
development
2. Fence setback will be required to be the same as house setback line at ~s 1, 3,
and 4/Block B and Lot 2/Block A
3. Show zoning on face of plat
4. Landscape L-2 does not show required sidewalk on Lot 1/Bh~ A.
5. Screeningfencing/signage at entry feature
drc12345