Woodlands of C/FP-DR 950323 (5)DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: The Woodlands of Coppell, Final Plat, to allow development of a 38 lot
residential subdivision on property located at the southwest of the
intersection of Coppell Road and Thweat, at the request of HAP
Engineering.
DRC DATE: March 23, 1995 & March 30, 1995
CONTACT: Ken Griffin, P.E., Assistant City Manager/City Engineer 004-3679)
COMMENT STATUS: ~/ INITIAL . ..~.,,-.,,~-~-
Platting Comments:
1. The signature block for the floodplain administrator should be shown.
2. List of all variances should be provided on the face of the plat.
3. The floodplain on Block A, Lots 1-6 should be labeled as a floodplain/drainage easement.
4. Visibility easement should be provided at the intersection of Winding Hollow with Coppell
Road.
5. You are showing a 5 foot fence easement around the perimeter of the site. Is the fence
going to be set in 5 feet? If so, who is going to maintain the 5 feet between the property
line and the fence?
6. Utility easement on the cul-de-sac of Manchester Lane should be properly shown and
dimensioned.
7. Landscape plans show a varying landscape easement of 10, 15 and 20 feet on lots 21 and
27 of Block A. That should be reflected on the plat.
8. The right-of-way width for the entrance of Winding Hollow Lane should be shown on the
face of the plat.
9. The note concerning DFW Airport should remove the reference to the Municipal Utility
District since it no longer exist.
10. All common areas should be labeled and maintained by the homeowners association.
Developer Information Comments:
1. Roadway, water and sewer impact fees will be required