Coppell MSW/SP,FP-DR010426 (2)DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: Coppell Middle School West, Site Plan and Final Plat, to allow the construction
of a service center with bus/maintenance vehicle parking, several building
additions, reconstruction of the concession building and re-paving of the asphalt
parking lot on approximately 51.7 acres of property located approximately 250
feet west of the intersection of Wrangler and Crestside Drives, at the request of
Glenn Engineering.
DRC DA TE: April 26, 2001 and May 3, 2001
CONTACT: Mike Martin, P.E., Assistant City Engineer (972-304-3679)
COMMENT STATUS: ,/PRELIMINARY F4NA~ P.E~.~C, SED
1. A separate meeting needs to be held between the City of Coppell and the Coppell Independent
School District regarding the existing and proposed water lines.
~'Zii APr27 2~00