Loading...
Kwik Kar's response to 8/22 letKwik INDUSTRIES, INC. From design and construction through service and supplies. September 19, 1997 City of Coppell Attn: Pert Virtanen P.O. Box 478 Coppell, TX 75019 I Kwik Kar Kwik Kart i Kwik ~ ~ m~ Kar Wash 10 #IN. OILCHANGE 10 MIN, OILCHANGE b SALES - SER¥ CE Re: Case No. S-2084K Kwik Kar Dear Pert: In response to your letter dated August 22, 1997, Kwik Industries, Inc. offers the following retort: We agree to restriction of the removal of existing trees to two 18" post oak trees, and one 16" post oak tree located closest to the existing building. The removal of these trees are necessary for the parking layout (item 2). Five Redbud trees six feet tall at time of planting and additional landscaping are proposed to replace the removed trees. We agree to the addition of concrete pavement to provide two(2) additional parking spaces in the area where three(3) existing trees are removed. Architectural elevations, are provided, which show building materials and style of the same nature as the existing building. The signs on the building, if removed, will show uneven wear due to the weathering of the brick. This will decrease the aesthetics of the building. It is not our intent to remove the Logo from the building. We agree to redesign the 6 customer directional signs in colors to match and coordinate with the business identification sign. We agree to removal of all portable signs since they are not permitted by Coppell sign regulations. We cannot agree to the terms of relocating the overhead power line a minimum of 80' from the Denton Tap right-of-way line. The owner of the Dryclean Supercenter will not allow us to cut his pavement. 4725 Nail Road Dallas Texas 75244 214-458-9761 1-800-442-5368 FAX 214-458-0948 KW-iN INDUSTRIES, INC. From design and construction through service and supplies. Kwik Kar OIL & LUBE 10 MIN. OIL CHANGE Kwik Kar LUBE & TUNE 10 kilN, 01[ CHANGE Kwik LKar Wash SALES - SERVICE Construction of a retaining wall 5 feet beyond the edge of the proposed pavement is shown on the landscape and site plan. The placement of temporary fencing or silt fence will be placed prior to and maintained throughout construction. 10. We would like to maintain our original variance on the construction of a screening wall on top of the retaining wall to comply with section 33 of the zoning ordinance. We feel that the wooded area is dense enough to screen the adjacent properties. 11. Additional light fixtures on the rear of the building addition shall be shielded. 12. The west end of the property shall be maintained in accordance with city standards. If you should have any additional comments or need further information please call my office at (972) 458-9761. Thank you in advance for the consideration. Respect~ll~ // Sid Hollingsworth Engineering Coordinator 4725 Nail Road Dallas Texas 75244 214-458-9761 1-800-442-5368 FAX 214-458-0948