Loading...
DRC comments City of Coppell Development Review Committee Comments Planning Department Amberpoint Business Park, Lots lA and lB, Replat S.W.C. of Sandy Lake and Northpoint DRC Date: August 29, 2002 and September 5, 2002 Planning & Zoning Commission Meeting: September 19, 2002 City Council Meeting: October 8, 2002 1. The Data Table needs to be corrected to reflect Lot lA and lB, instead of IR and 2R. 2. Fire lane radius are required to be 30'inside and 54' outside. 3. Need to add the Flood Plain Administrators signature block. 4. Need to revise TXU Electric and Gas signature line to TXU Gas and Oncor Energy Delivery. 5. Place Volume and Page in the lower right hand comer of the plat. Note: A. Please revise plats, site plans, landscape plans, and building elevations based on staff recommendations. Should applicant disagree with staff comments please provide reasons why staff recommendations should not be followed when you attend the September 5th Development Review Committee (DRC) meeting. Each applicant will bring two new sets of revised plats and plans to the September 5th DRC meeting. Applicants will be asked to show, explain and defend any revision. An Engineer for the project or other representative is urged to attend the meeting. Applicant will have till noon Tuesday, September 10th tO resubmit fourteen (14) folded copies of revised plans, three (3) reduced paper copies (8 1/2 X 11) and JPEG files OR SIMILAR ELECTRONIC FORMAT of each exhibit to the Planning Department. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: AmberPoint Business Park, Lots lA and lB, Block A, Replat, to subdivide Lot 1, containing 36.12 acres, into two lots to allow for the construction of a 200,000 square foot office/warehouse with future expansion of an additional 190,000 square-feet, on Lot lA, containing 17.9 acres of property and a 308,000 square-foot office warehouse on Lot lB, containing 18.21 acres of property located at the southwest corner of Sandy Lake Road and Northpoint Drive, at the request of Transwestern Commercial Services. STAFF REP.: Marcie Diamond DRC DA TE: August 29, 2002 a~d september 5, 2002 CONTACT: Teresa M. Turner, E. L T., Graduate Engineer (972)304-3681 COMMENT STATUS: ¢' PRELIMINARY REI~£ED 1. The minimum width of utility and drainage easements is 20' rather that the 15' shown. 2. A private easement from the property to the south will need to be obtained to tie into the existing 8" waterline. DEVELOPMENT REVIEW COMMITTEE FIRE PREVENTION COMMENTS ITEM: .4MBERPOINT BUSINESS PARI~ , LOTS 1.4 & lB BLK .4 DRC DATE: AUGUST29, 2002 CONTACT: TRAVIS CRUMP, FIRE MARSHAL. (972) 304-3503 COMMENT STATUS: INITIAL PRELIMINARY 1. Minimum inside radius is 30 feet. Minimum outside radius is 54 feet. Marcie Diamond - 82902amberpointlOtSlai13repiat,d0c Page 1 DEVELOPMENT REVIEW COMMITTEE PARKS AND LEISURE SERVICES COMMENTS ITEM: AmberPoint Business Park, Lots IA and lB, Block A, Replat DRC DATE: August 29, 2002 and September 5, 2002 CONTACT: John Elias, Landscape Manager COMMENT STATUS: I PRELIMINARY I FINAL No Comments REVISED P&Z JE 82902amberpointlotsl al breplat DEVELOPMENT REVIEW COMMIT-FEE ENGINEERING COMMENTS ITEM: AmberPoint Business Park, Lots lA and lB, Block A, Replat, to subdivide Lot 1, containing 36.12 acres, into two lots to allow for the construction of a 200,000 square foot office/warehouse with future expansion of an additional 190,000 square-feet, on Lot IA, containing 17.9 acres of property and a 308,000 square-foot office warehouse on Lot lB, containing 18.21 acres of property located at the southwest corner of Sandy Lake Road and Northpoint Drive, at the request of Transwestern Commercial Services. STAFF REP.: Marcie Diamond DRC DA TE: August 29, 2002 and September 5, 2002 CONTACT: Teresa M. Turner, E.I.T., Graduate Engineer (972)304-3681 COMMENT STATUS: No Commems. REI~£ED : ~cp -6 2002