Loading...
DRC comments 090502 City of Coppell Development Review Committee Comments Planning Department Sherrill Acres, Lot 2B, Block 1 Final Plat Angier's Professional Building Belt Line, 1,700 feet east of MacArthur DRC Date: August 29, 2002 and September 5, 2002 Planning & Zoning Commission Meeting: September 19, 2002 City Council Meeting: October 8, 2002 3. 4. 5. 6. Revise name of plat to read Sherrill Acres, Lot 2B, Block 1, Final Plat. (This entire area was preliminary platted as Sherrill Acres). Revise reference to name of plat within the City Secretary Signature Block as well. Revise title block to show the acreage of the site. Revise Fire Lane curve radii, minimum 30' inside and 54' outside. Eliminate notations to the side yard setback and extend the 60' front yard setback line across the entire front of the property. Provide utility signature blocks for AT&T Broadband Cable, Verizon Telephone, TXU Gas/Oncor Energy Delivery Co. The Preliminary Plat for Sherrill Acres indicates a 15' Hike & Bike Trail easement along the front of the property over the 15' Public Utility Easement, parallel to Belt Line Road and the Hike & Bike Trail extending along the western boundary of this property, both of these easements need to be shown on this final plat. Does the proposed 15' drainage easement located just south of the 60' front yard setback simply terminate where the fire lane runs along the east property line? If the easement does not terminate, please indicate it's extension across the Fire Lane to the adjacent property. Note: A. Please revise plats, site plans, landscape plans, and building elevations based on staff recommendations. Should applicant disagree with staff comments please provide reasons why staff recommendations should not be followed when you attend the September 5th Development Review Committee (DRC) meeting. Each applicant will bring two new sets of revised plats and plans to the September 5th DRC meeting. Applicants will be asked to show, explain and defend any revision. An Engineer for the project or other representative is urged to attend the meeting. Applicant will have till noon Tuesday, September l0th to resubmit fourteen (14) folded copies of revised plans, three (3) reduced paper copies (8 1/2 X 11) and JPEG flies OR SIMILAR ELECTRONIC FORMAT of each exhibit to the Planning Department. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Sherrill Acres, Lot 2B, Final Plat request to allow the development of Angler's Professional Buildings, two medical office buildings containing a total of 12,464 square feet on 1.44 acres of property located along the south side of Belt Line Road, approximately 1,700 feet east of MacArthur Boulevard, at the request of Pogue Engineering. STAFF REP.: Andrea Roy DRC DA TE: August 29, 2002 and September 5, 2002 CONTA CT: Teresa M. Turner, E.L T., Graduate Engineer (972)304-3681 COMMENT STATUS: ,,"PRELIMINARY 1. Plat cannot be adequately reviewed without a preliminary utility plan. 2. Drainage easements are a minimum of 20'. 3. Fire hydrants on private property do not require easements. DEVELOPMENT REVIEW COMMITTEE FIRE PREVENTION COMMENTS ITEM: DRC DATE: CONTACT: SHERRILL ACRES, LOT 2B, FINAL PLAT .4 UGUST 29, 20O2 TRA VIS CR UMP, FIRE MARSHAL. (972) 304-3503 COMMENT STATUS: PRELIMINARY FIN. 1. Minimum inside radius for fire lanes is 30 feet. Minimum outside radius is 54 feet. Marcie Diamond - 82902sherriiia~r~iot2bfinalpla~d5~ Page 1 DEVELOPMENT REVIEW COMMITTEE PARKS AND LEISURE SERVICES COMMENTS ITEM: Sherrill Acres, Lot 2B, Final Plat DRC DATE: August 29, 2002 and September 5, 2002 CONTACT: John Elias, Landscape Manager COMMENT STATUS: I PRELIMINARY I FINAL r REVISED P&Z No Comments JE 82902sherrillacreslot2bfinalplat