Loading...
S-1202-AG-081302COPPELL AGENDA REQUEST FORM * ,~T~r~i~"~ ~Y. ~ ~ C'ITY COUNCIL MEETING: August 13,2002 ITEM# 11 ITEM CAPTION: PUBLIC HEARING: Consider approval of Case No. S-1202, Gateway Business Park, No. 2, Lot 2R, Block C, zoning change request from LI (Light Industrial) to LI-S-1202 (Light Industrial, Special Use Permit-1202), to allow outside petroleum products storage. Also, the Site Plan is being revised to increase the size of Lot 2R by 0.303 of an acre, allow a generator with a screening wall and construction of 32 additional parking spaces on 7.613 acres of property located at 555 Dividend Drive. SUBMITTED BY: Gary L. Sieb TITLE: Director of Planning and Community Services STAFF COMMENTS: Date of P&Z Meeting: July 18, 2002 Decision of P&Z Commission: Approved (6-0) with Commissioners McGahey, Halsey and Stewart voting in favor. None opposed. McCaffrey, Clark, Kittrell, Approval is recommended, subject to the following conditions: 1) The development of this property shall be in accordance with the site plan, landscape plan and elevations of the screening wall. 2) Adherence to all Fire and Building Codes. Staff recommends approval. APPROVED BY CITY COUNCIL ON ABOVE DATE Close PH & Approved, subject to conditions 1 & 2 above and conditions 3) In the event this generator is no longer needed, the generator, screening walls and non-r'equived landscape shall be ~emoved. M - Vovk $ - Brancheau Vote - 6-0 DIR. iNITIALS: FiN. REVIEW: Agenda Request Form Revised 5/00 CITY MANAGER REVIEW: ~2SI202 GBP#21-Agenda Request CASE NO.: CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT S-1202, GATEWAY BUSINESS PARK, No. 2 LOT 2R, BLOCK C P & Z HEARING DATE: C.C. HEARING DATE: July 18, 2002 August 13, 2002 STAFF REP.: Marcie Diamond, Assistant Planning Director LOCATION: 555 Dividend Drive. SIZE OF AREA: 7.613 acres of property, containing a 104,000-square-foot building. CURRENT ZONING: LI (Light Industrial) REQUEST: LI-S-1202 (Light Industrial, Special Use Permit-1202), to allow outside petroleum products storage. APPLICANT: HISTORY: Owner; Robert McCann Catellus Development 5720 LBJ Freeway # 190 Dallas, TX 75240 972-419-1907 972-419-1925 Architect: Terrance J. Wright Wright Group 1110 S. S. Elm Street Carrollton, TX 75006 972-242-1015 972-446-8013 In December 1998, Council approved a site plan and preliminary plat with three lots totaling 32.82 acres for this tract of property. The final plat for 7.31 acres was approved by the Planning and Zoning Commission in 1999. The approved site plan was for a Item # 6 103,611-square-foot (2-story) office building, which has since been constructed. In March of this year, Council approved a site plan amendment for this office building, allowing for an emergency generator with screening wall to be located in close proximity to the east end of this building. Per the recommendation of the Planning and Zoning Commission, the screening wall was revised to incorporate various design features of the existing office building (spandrel glass and reveals). This approval was also subject to the condition that in the event this generator is no longer needed, the generator, screening walls and non-required landscaping shall be removed. TRANSPORTATION: LBJ Freeway is a full-service freeway built to standard. This tract may be accessed from the Freeport Parkway exit. Dividend Drive was constructed with this development and is located at the northeastern edge of this tract. This street contains enhanced pavement and landscaping and is the entry road into the Gateway Business Park. SURROUNDING LAND USE & ZONING: North- vacant; LI (Light Industrial) South - LBJ Freeway East - Coppell Middle School West; C (Commercial) West - vacant; LI (Light Industrial) COMPREHENSIVE PLAN: The Comprehensive Plan shows the property as suitable for freeway commercial uses. DISCUSSION: The applicant desires to revise the site plan to accommodate three revisions: add 32 parking spaces, provide for a back-up generator and, finally, a 4,000-gallon above-ground gasoline storage tank for the back- up generator. Per Section 12-30-12.9 of the Zoning Ordinance, the fourth request, "petroleum products storage" requires a Special Use Permit in the Light Industrial district. Therefore, this site plan, as required for a SUP, also incorporates all other elements requesting revisions. ADDITIONAL PARKING There are 445 existing parking spaces serving this 103,611-square-foot office building, which exceeds the parking required by zoning by approximately 100 spaces. However, the new tenant for the northern portion of this building, Washington Mutual, requires additional parking Item # 6 to meet the needs of their employees. Specifically, this request is to increase the parking by 32 for a total parking count of 477 spaces. The area of this lot has been increased by 0.303 of an acre to accommodate this parking lot expansion and has been designed in accordance with the Landscape Ordinance, whereas there is a 10-foot landscape buffer with dwarf Burford Holly shrubs and Cedar Elm trees. Internal to the parking lot, there are landscape islands, with a minimum of 150-square feet and a Live Oak tree in every planting island. The landscape materials match those in the existing development. BACK-UP GENERATOR Given the operating characteristics of this use, a secondary source of power is required. This generator is similar to the generator recently installed at the south end of the building for the other major tenant, Brinks Security. In that request, the generator was in very close proximity to the building, and the screening wall was designed to appear to be part of the main structure. In this request, the generator will be located within the parking lot area, adjacent to the existing dumpster. The 10-foot high screening wall is proposed to be an 8"-thick concrete panel wall, painted to match the existing building. Given that each side of this screening wall will be approximately 30 feet in length, vertical reveals have been added at 10-foot intervals, as well as a horizontal reveal two feet from the top of the wall. The elevation that is visible to the parking lot will have a door and louver, which shall be painted gray to match the accent color of the main building. This wall will be of sufficient height to screen both the generator and the fuel storage tank. Cedar Elm trees and a Burford Holly hedge will be extended around this wall. PETROLEUM PRODUCTS STORAGE The final portion of this request is for the inclusion of a 4,000-gallon fuel storage tank to serve the back-up generator. Per the requirements of the Light Industrial district, "petroleum products storage" requires a Special Use Permit. In the Fire Marshal's review of this request, he stated that given the environmental concerns with below-ground fuel storage tanks, the Fire Department prefers all above ground tanks. The Fire Department requires the fuel tanks to meet ridged standards, including reinforced fuel storage tanks with secondary containment. The applicant will be required to meet all environment requirements during the permitting stage. Item # 6 RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff is recommending APPROVAL of S-1202, Gateway Business Park, No. 2 Lot 2R, Block C, subject to: 1) Adherence to all Fire and Building Codes. ALTERNATIVES: 1) Recommend approval of the request. 2) Recommend disapproval of the request 3) Recommend modification of the request 4) Take under advisement for reconsideration at a later date. ATTACHMENTS: 1) Site plan 2) Enlarged Site Plan 3) Landscape Plan 4) Generator Yard Plan, Elevations and Details Item # 6