Loading...
9/5/02 DRC comments City of Coppell Development Review Committee Comments Planning Department Coppell First Assembly of God Site Plan 200 S. Heartz Road DRC Date: August 29, 2002 and September 5, 2002 Planning & Zoning Commission Meeting: September 19, 2002 City Council Meeting: October 8, 2002 SITE PLAN 1. Need North arrow on site vicinity map. 2. Show zoning west of Heartz Road. 3. CIVIC Report encourages natural brick, not paimed brick--need to discus gray painted masonry. 4. Explain note which declares City of Coppell owning 1.17 acres on north side of site. 5. Note square footages of all existing and proposed buildings. 6. Dimension length of all colonnade walls. 7. Specify height of church rotunda and its diameter; breezeway including roo£ 8. Specify height of porte cochere including roof area. 9. Need monument sign information including size, height, material, lighting, etc. 10. Please indicate exterior building materials on all buildings. 11. Include baseball field on site plan. LANDSCAPE PLAN 1. Landscape screening needed on parking spaces next to I-Iea~z Road and on spaces along south side of site. 2. Caliper o£trecs is measured four feet six inches above grade, not six inches. 3. Need landscaping materials planting table on landscape plan. Note: A. Please revise plats, site plans, landscape plans, and building elevations based on staff recommendations. Should applicant disagree with staff comments please provide reasons why staff recommendations should not be followed when you attend the September 5th Development Review Committee (DRC) meeting. each applicant will bring two new sets of revised plats and plans to the September Sth DRC meeting. Applicants will be asked to show, explain and defend any revision. An Engineer for the project or other representative is urged to attend the meeting. Applicant will have till noon Tuesday, September l0th to resubmit fourteen (14) folded copies of revised plans, three (3) reduced paper copies (8 1/2 X 11) and JPEG flies OR $IMIL4R ELECTRONIC FORMAT of each exhibit to the Planning Department. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Coppell First Assembly of God, Site Plan, request to allow a 1,558 square foot expansion to the existing 29,488 square-foot church facilities, and the addition of 24 new parking spaces on approximately 6.03 acres of property located at 200 S. Heartz Road, at the request of Rodney Collver, Coppell First Assembly of God. STAFF REP.: Gary Sieb DRC DA TE: August 29, 2002 and September 5, 2002 CONTA CT: Teresa M. Turner, E.I.T., Graduate Engineer (972)304-3681 COMMENT STATUS: ·/PRELIMINARY F4N¢~ The plat and site plan should be changed to correctly reflect that Heartz Road is a 50' right-of- way. ITEM: DRC D_dTE: CONT~4CT: COMMENT ST~4 TUS: DEVELOPMENT REVIEW COMMITTEE FIRE PREVENTION COMMENTS COPPELL ASSEMBLY OF GOD, SITE PLAN AUGUST 29, 2002 TRA VIS CR UMP, FIRE MARSHAL. (972) 304-3503 !A~TL 4L PRELIMINARY 1. Plat all fire lanes as easements. DEVELOPMENT REVIEW COMMITTEE BUILDING INSPECTION COMMENTS Coppell First Assemb& of God Church DRC DATE: August 2~, 2002 CONTACT: Greg Jones, Ckief Building Offwial (304-3500) COMMENT STA TUS: ,/INITIAl, ~ 1. No comments 2. drc12345 Marcie Diamond - 82§02coppellfirstassemblySiteplan.d8~: Page 1 DEVELOPMENT REVIEW COMMITTEE PARKS AND LEISURE SERVICES COMMENTS ITEM: Coppell First Assembly of God, Site Plan DRC DATE: August 29, 2002 and September 5, 2002 CONTACT: John Elias, Landscape Manager COMMENT STATUS: I PRELIMINARY I FINAL I REVISED P&Z No Comments JE 82902coppellfirstassemblysiteplan DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Coppell First Assembly of God, Site Plan, request to allow a 1,558 square foot expansion to the existing 29,488 square-foot church facilities, and the addition of 24 new parking spaces on approximately 6.03 acres of property located at 200 S. Heartz Road, at the request of Rodney Collver, Coppell First Assembly of God. STAFF REP.: Gary Sieb DRC DA TE: August 20, 2002 and September 5, 2002 CONTACT: Teresa M. Turner, E. LT., Graduate Engineer (972)304-3681 COMMENT STATUS: PRELI~,s~,rARY ,,"FINAL 1. The existing waterline along Heartz Road should be shown on the site plan. 2. Revise the right-of-way to show the current limits as discussed in the replat comments.