Loading...
Memo re need for appli. process T H E C I T Y 0 F COPiSEL£ Planning Department 255 Parkway Blvd Coppell, Texas 75019 Phone: 972-304-3678 Fax: 972-304-7092 PROJECT: LoneStar Plywood Dust Collector PLANNING DEPARTMENT CONTACT: Andrea L Roy DIRECT DIAL: 972-304-3677 FAX COVER SHEET DATE: September 16, 2002 PAGES: F(including cover) TO: Mark W. Pross Pross Design Group FAX: 214-350-7344 PHONE: 214-350-5602 Items Transmitted 1. Site Plan Application 2. Filing Fee Schedule Remarks Mark- After discussing this case with my Director, it was determined that this addition does warrant full Planning & Zoning Commission review and City Council approval. I have attached the necessary application and the Filing Fee Schedule for the request. This request would be classified as a "Site Plan Amendment". 1) I spoke with the Fire Marshal regarding the proposed covered outside storage area and he informed me that anything covered would require it to be spdnldemd, regardless of the fact that these materials might be purely lumber, doors, etc. 2) Also, I have put a call in to our Building Official regarding the masonry/non-masonry materials for the screening enclosure. I have not yet heard back from him, but I do recall a recent case of a similar situation where an alternative matedal was utilized that satisfied our masonry requirement. I will pass on this information es soon as I obtain it from the Building Official. At this point, you may leave the building matedal as is. T H £ C I T Y · 0 F COI PEi L Planning Department 255 Parkway Blvd Coppell, Texas 75019 Phone: 972-304-3678 Fax: 972-304-7092 I have done a cursory review of the submitted plans, which provide the majority of information needed for a full review. The only requests I have at this point are: · Please resubmit only sheets A3.1, A3.0, and Al.0 A, and a Landscape Sheet showing the affected landscaping. Show the outline of the proposed mechanical equipment behind the screen wall on Sheet A3.1. This will allow us to see the precise height in comparison to the screen wall and the location of the equipment from an elevation view. · Provide any manufacturer specs on the dust collection system, if available. · Lightly cloud the affected area on the site plan sheet (Sheet A1.0 A) · Revise the size of the plan sheets to a standard 24" x 36" and fold so that the sheet number and page title is located in the lower dght hand comer. · Provide 14 sets of the above requested sheets by Wednesday at noon. Please don't hesitate to call if you have any questions or if additional time is needed to provide the above documents. I may be reached at 972-304-3677 or e-mail: aroy@ci.coppell.tx, us.