9/2/87 DRC commentsDRC Minutes
Review of:
A.
Page 2
ENGINEERING: ~-~ ~)~ ~L~"~ZZ )
()~'~Need a signature block for Utility Companies.
( ) No Comment.
()/~Plat is acceptable.
DRC MINUTES
Review of:
H.
Page 9
DEVELOPMENT INSPECTIONS:
Preliminary~ plat(s) is/are acceptable.
(
)
1.
( ) 2. Will need Soils Report to determine if sub-grade
will require Lime Stabilization.
( ) 3. Use of cushion sand under paved surfaces is not
allowed.
( ) 4.
Prior to beginning construction, a Pre-Construction
Conference must be scheduled with the Chief of Land
Development. (Contact Steve Morton @ 462-~-2-)-.
DEC MINUTES
Review of:
Page
TEXAS POWER AND LIGHT
( ) 1. Service is available.
( ) 2. Service details to be werked out with building
plans.
(~)) 3. Pr~/Final plat(s) i~ acceptable.
DRC MINUTES
Page 8
TEXAS POWER AN~ LIGHT
( ) 1. Service is available.
( ) 2.
(
Service details to be worked out with building
plans.
~y/Final plat (s) is/~ acceptable.
DRC MINUTES
Page 9
Review of:
DEVEI,OPMENT INSPECTIONS:
) 1. Preliminary/Final plat(s) is/are acceptable.
~.) 2. Wfll need Soils Report to determine if sub-grade
will require Lfme StabJ]Jzation,
/? 3. Use of cushion sand under paved surfaces is
allowed.
not
(,) 4.
Prior to beginning construction, a Pre-Construction
Conference must be scheduled with the Chief of Land
Deve]opment. (Contact Steve Morton @ 462-0022).
Review of:
SUMMARY
DEVELOPMENT REVIEW COMMITTEE
o
PLANNING AND DEVELOPMENT:
1)
Revisions and markups must be submitted by 12:00 p.m. on
Tuesday, , 19 ; to be eligible for
, 19
the
2)
This item is scheduled for DRC on , 19 A
representative should attend this meeting; however, it is not
mandatory.
3)
This item is tentatively scheduled for
Planning and Zoning Commission action.
· 19
4) Review will continue when additional information is submitted.
5) Preliminary/Final Plat is/are acceptable.
6)
Please submit sets of folded plans prior to
in order to be reviewed by the
Planning and Zoning Commission and the City Council.
7)
Respond to all comments in the form of a letter addressed to
Taryon Bowman, DRC Chairperson, 255 Parkway Boulevard,
Coppell, Texas 75019.
Please contact the followin~ Departments should you, have any questions:
DEPARTMENT:
Building Inspections
Development Inspections
Engineering
Fire Department
Planning & Zoning
Public Works
Tax Department
CONTACT:
Dale Jackson, Building Official
Steve Morton, Chief of Land Dev.
Shohre Daneshmand, Civil Engineer~
Troy Glidewell, Fire Marshal
Taryon Bowman, P & Z Coordinator
Steve Goram, Public Works Director
Debbie Birdsall, Tax Assessor
TELE. #:
462-0022
462-0022
462-0022
462-1133
462-0022
462-0022
462-0022
Coppell I.S.D.
General Telephone
Ginn, Inc.
Lone Star Gas
Paragon Cable
Texas Power & Light
Texas Power & light
U.S. Post Office
David Stanfiel~
Gabe Favre
Jerry Sauer
Joel Kirklan~3~\~/
Glen Fabian
Gi~er ~are
471-1111
434-2724
248-4900
253-5102
259-1500
8~-i38~'~
462-0901
DRC/S~MMARY
Review of:
.,_RECEIVED
SUMMARY
DEVELOPMENT REVIEW COMMITTEE
PLANNING AND DEVELOPMENT:
2)
Revisions and markups must be submitted by 12:00 p.m. on
Tuesday, ~/. / , 19~ / ; to be eligible for
the
This item is scheduled for DRC on , 19 A
representative should attend this meeting; however, it is not
mandatory.
~ This item is tentatively scheduled for ,~TT. /7 , 19 87
Planning and Zoning Commission actionA% 7:~.~. ~~
4) Review will continue when additional information is submitted.
5) Preliminary/Final Plat is/are acceptable.
6)
Please submit sets of folded plans prior to
in order to be reviewed by the
Planning and Zoning Commission and the City Council.
7)
Respond to all comments in the form of a letter addressed to
Taryon Bowman, DRC Chairperson, 255 Parkway Boulevard,
Coppell, Texas 75019.
Please contact the followin~ Departments should you have any ~uestions:
DEPARTMENT:
Building Inspections
Development Inspections
Engineering
Fire Department
Planning & Zoning
Public Works
Tax Department
CONTACT:
Dale Jackson, Building Official
Steve Morton, Chief of Land Dev.
Shohre Daneshmand, Civil Engineer
Troy Glidewell, Fire Marshal
Taryon Bowman, P & Z Coordinator
Steve Goram, Public Works Director
Debbie Birdsall, Tax Assessor
TELE. #:
462-0022
462-0022
462-0022
462-1133
462-0022
462-0022
462-0022
Coppell I.S.D.
General Telephone
Ginn, Inc.
Lone Star Gas
Paragon Cable
Texas Power & Light
Texas Power & light
U.S. Post Office
David Stanfield
Jerry Davis
Gabe Favre
Jerry Sauer
Joel Kirkland
Glen Fabian
David Adams
Ginger Ware
471-1111
434-2724
248-4900
253-5102
259-1500
888-1382
888-1386
462-0901
ADDITIONAL COMMENTS:
DRC / SUMMARY
SUMMARY
DEVELOPMENT REVIEW COMMITTEE
Review of:
PLANNING AND DEVELOPMENT:
~ Revisions agd markups must be sub.mitted by 12:00 p.m. on
Tuesday, ~,~ , 79~7 , to be eligible for the
Ih~ item is scheduled for O~C on~ ,~ , 19~7 . ~
representative should attend this mee~ng; however, it is not
mandatory.
3) This item is tentatively scheduled for ~, ~ , 19~7
~ni~g 9~d Zoning Co~ission action. ~~ ~~
4) Review wilYeont~nue when additional information is submitted.
5) Preliminary/Final Plat is/are acceptable.
6)
Please submit sets of folded plans prior to
in order to be reviewed by the
Planning and Zoning Commission and the City Council.
7)
Respond to all comments in the form of a letter addressed to
Taryon Bowman, DRC Chairperson, 255 Parkway Boulevard,
Coppell, Texas 75019.
Please contact the followin~ Departments should you have any questions:
DEPARTMENT:
Building Inspections
Development Inspections
Engineering
Fire Department
Planning & Zoning
Public Works
Tax Department
CONTACT: TELE. #:
Dale Jackson, Building Official 462-0022
Steve Morton, Chief of Land Dev.~'~ 462-0022
Shohre Daneshmand, Civil Engineer~ 462-0022
Troy Glidewell, Fire Marshal 462-1133
Taryon Bowman, P & Z Coordinator'S. 462-0022
Steve Goram, Public Works Director 462-0022
Debbie Birdsall, Tax Assessor 462-0022
Coppell I.S.D.
General Telephone
Glnn, Inc.
Lone Star Gas
Paragon Cable
Texas Power & Light
Texas Power & light
U.S. Post Office
David Stanfi~
Jerry Davi~
Gabe Favre~
Jerry Sauer
Joel Kirkland
Glen Fabian
Ginger Ware
471-1111
434-2724
248-4900
253-5102
259-1500
ooo 1386
462-0901
DRC/SUMMARY
PZAGN