2/7/02 DRC commentsDEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Wvnnoage Plaza South, Building 2. Site plan~ request to allow the development of an approximately 9,000 square-foot office building on approximately 1 acre of propert~ located at the southwest corner of Denton Tap Road and Wynnpage Drive, at the request of Stifling Wainscott Builders, Inc. DRC DA TE: January 31, 2002 and February 7, 2002 CONTACT: Gary W. Johnson, P.E., .4ss~ City Engineer (972-304~3679) COMMENT STATUS: 1. FYI - Utility layouts are still conceptual and modifications may be requested by this department during plan review. ITEM: DEVELOPMENT REVIEW COMMITTEE BUILDING INSPECTION COMMENTS W. vnnpage Plaza South, Building 2 DRC DATE: January31, 2002 CONTACT: Greg Jones, Chief Building O~wial 004-3500) COMMENT STATUS: ~ ~d~d?~4V~ 1. No floor plan information furnishe~l No site comments made. Marcie Diamond; ! 3! 02wynnpagepi~zasitepl~h.doc DEVELOPMENT REVIEW COMMITTEE PARKS AND LEISURE SERVICES COMMENTS ITEM: Wynnpage Plaza South, building 2, site plan DRC DATE: January 31, 2002 and February 7, 2002 CONTACT: John Elias, Landscape Manager COMMENT STATUS: I PRELIMINARY I FINAL I REVISED P&Z I) Landscape tabulations don't add up, short 4 trees. JE 13102wynnpageplazasiteplan 01/31/2002 12:06 9723043514 COPPELL FIRE DEPT PAGE 07 DEVELOPMENT REVIEW COMMITTEE FIRE PREVENTION COMMENTS _ ITEM: WYNNPAGE PLAZA SOUTH, BLD. 2, SITE PLAN DRC DATE: JANUARYS1,2002 CONTA'CT: TRAV~S CRUMP, FIRE MARSHAL. (972) 304-3505 1. NO Conlvaen~, DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS 4. 5. 6. ITEM: Wynnpage Plaza South, Building 2, Site Plan, request to allow the development of an approximately 9,000 square-foot office building on approximately 1 acre of property located at the southwest corner of Denton Tap Road and Wynnpage Drive, at the request of Stirling Wainscott Builders, Inc. DRC DATE: January 31, 2002 and February 7, 2002 CONTA CT: Gary I~. Johnson, P.E., Asst. City Engineer (972-304-3679) COMMENT STATUS: '/PRELIMINARY .a~TER P&Z Add the following note: "All construction shall conform with City standards. Civil drawings should be submitted to Engineering Department for approval and permitting prior to construction." Provide a corner clip easement at the northeast corner or the property for sidewalk ramp per city specifications. Provide a sight visibility triangle at the intersection in the northeast corner of the property. Show the proposed utility easement on the west property line. Add a utility layout to the Site Plan submittal. Revisit providing the utility easement in the same location as the 10-foot landscape buffer and the parking stalls. Eliminate the proposed drive on the north side of ~3,, ,an~ge..Drive. City of Coppell Development Review Committee Comments Planning Department Wynnpage Plaza South, Building 2 Site Plan Southwest Corner of Denton Tap and Wynnpage Drive DRC Date: January 31, 2002 & February 7, 2002 Planning & Zoning Commission Meeting: February 21, 2001 City Council Meeting: March 12, 2001 Site Plan Sheet 1. Indicate proposed use of building (ie- medical office & business professional office), as well as indicating the breakdown for parking (1/175 & 1/300). Staff recommends the applicant indicate that Medical Office will occupy a maximum percentage of the building. This will allow for some flexibility, if more office actually occupies the premises in the future. 2. Notation regarding proposed monument sign indicates that a 24" high berm will be constructed to support the proposed 4' high monument sign. Please refer to the height definition in Section 12-42-1 Definitions- height. It appears that the height will exceed the allowable 4' ifa berm is constructed. 3. Show existing or proposed drainage easements. 4. Show any proposed parking lot/building lighting. 5. While no preliminary engineering (Conceptual Utility Plan) plans were provided, it is assumed that Engineering staff may utilize the detailed construction plans which were submitted to Engineering for review. Please confirm this with Engineering. 6. Indicate the need for an 8' high dumpster screen wall? Staff is aware that this is also proposed for Building 1, but is this needed? Architectural Elevations 7. As designed, the architectural front of the building faces the rear of the site (towards Wyunpage subdivision). While staff has no objection to the access po/nts of the building being placed at the rear of the site, the building elevation visible from Denton Tap appears to be the actual rear of the building, possessing no entrances or architectural enhancements/detailing. Staff would request that some articulation be made along this wall. There also appears to be a blank area along the front wall, which may be an entrance. Staff would also recommend that this entry be shifted to the south and enhanced with characteristics similar to the rear entrances. Further, the proposed south entrance may be shifted closer to Denton Tap Road to provide some additional relief, perhaps wrapping the accents around the comer. 8. Revise elevations to show material details on the east elevation, as is done for the west and south elevation. Landscape Plans 9. Provide a tree survey showing any existing trees, indicating if those that will be removed and any that will be preserved. (A portion of the Wynnpage entrance trees are located on the subject site) 10. Prior to final approval by City Council, provide irrigation plans for review by the City's Landscape Manager. 11. Indicate the dimension of all property lines on landscape plans. 12. Provide a tree within the island adjacent to the proposed dumpster. 13. Perimeter landscape calculations are incorrect with regard to south, west, north, and east property lines. It appears that the Landscape Architect believed the west property line to be the north, due to the manner in which the plan is placed on the sheet. (The north property line doesn't measure 260', but the west property line does) Note: A. Please revise plats, site plans, landscape plans, and building elevations based on staff recommendations. ShouM applicant disagree with staff comments please provide reasons' why staff recommendations shouM not be followed when you attend the February 7tn Development Review Committee (DRC) meeting. Each applicant will bring two new sets of revised plats and plans to the February 7th DRC meeting. Applicants will be asked to show, explain, and defend any revision. A representative for this project is required to attend the meeting. Applicant will have till noon Tuesday, February 12a to resubmit fourteen (14) folded copies of revised plans, three (3) reduced paper copies (8 1/2 X 11) and one JPEG or Powerpoint Slide of each exhibit to the Planning Department. Bobby Oney New Const~ion Manager Oncor Distribution Division 4200 N. Belt Line Road Irving, Texas 75038 January 30, 2002 Comments For City of Coppell Development Review Committee JAN 3 1 2002 Wynnpage Plaza South, Building 2, Site Plan and Wynnpage Plaza, Lot 2, Block A, Minor Plat Easement needed along Denton Tap. Contact David Dean at 972-323-8907