10/3/02 DRC comments City of Coppell Development Review Committee Comments Planning Department Riverview Office Development, Lot 1, Block 1 Site Plan S.W.C. of Sandy Lake and Riverview DRC Date: September 26,2002 and October 3, 2002 Planning & Zoning Commission Meeting: October 17, 2002 City Council Meeting: November 12, 2002 Site Plan 1. The proposed driveway will not be served by a median opening once Sandy Lake is built to standard. 2. Is this proposed to be a phased development? If so, please designate phasing on the site plan. Also, the entire fire lane needs to be constructed with the first phase of development. 3. The dumpster needs to be relocated, it is directly facing the street and in close proximity to the single family homes. 4. Paving for the parking lot needs to be removed from the required landscape buffer adjacent to the southern property line. 5. The required 6 foot screening wall needs to be added to all property lines that are adjacent to single family zoned and development areas. 6. The entire fire lane needs to be delineated and dimensioned on the site plan. 7. Revise the building lines, to be as required by the "R" District, 30' with no front yard parking, 60' with parking in the front yard, 30 foot side yard adjacent to a street, and 20' rear yard adjacent to residential zoning district. 8. Need to add 8-foot wide brick paver bands 1 foot inside the property line at both driveways. Landscape Plan 1. Verify that there are no trees on the property. 2. Need to graphically indicate the areas proposed to fulfill the non-vehicular landscaping requirement, especially the 50% in the front yard. 3. It is assumed that all landscaped areas will be hydromulched. 4. The paving needs to be removed from the required 10-foot buffer adjacent to the southern property line. 5. Indicate the required 6-foot screening wall adjacent to the residentially zoned and developed properties. 6. Correct building lines, and indicate on Landscape Plan 7. Graphically indicate the required landscape buffers, the labels are there, but the lines are not. Page 1 of 2 Elevations 1. Need to correct the labeling of the elevations, it appears that the north/south and east west are reversed. 2. Consider adding accent materials (up to 20% of the exterior) such as stone, to embellish the entries into the buildings. Window treatments should also be considered. 3. Need to add elevations of the proposed screening wall and screening devise for the dumpsters, including gates. 4. Need to add manufacture's specs to building materials on elevations. 5. Need to submit a color board at the October 3, 2002 DRC meeting. Note: A. Please revise plats, site plans, landscape plans, and building elevations based on staff recommendations. Should applicant disagree with staff comments please provide reasons why staff recommendations should not be followed when you attend the October 3rd Development Review Committee (DRC) meeting. Each applicant will bring two new sets of revised plats and plans to the October 3fa. DRC meeting. Applicants will be asked to show, explain and defend any revision. A representative of the project is required to attend the meeting. Applicant will have till noon Tuesday, October 8th to resubmit fourteen (14) folded copies of revised plans, three (3) reduced paper copies (8 1/2 X 11) and JPEG ,TIF OR SIMILAR ELECTRONIC FORMAT of each exhibit to the Planning Department. Page 2 of 2 2oo2 DEVELOPMENT REVIEW COMMI-'FFE'z ENGINEERING COMMENTS ITEM: Riverview Office Development, Lot 1, Block 1, Site Plan, to allow the development of four office buildings totaling 19,800 square-feet on 2.17 acres of property located at the southwest corner of Sandy Lake Road and Riverview Drive, at the request of Stirling Wainscott, Inc. DRC DA TE: September 26, 2002 and October 3, 2002 CONTACT: Teresa M. Turner, E.I.T., Graduate Engineer (972)304-3681 COMMENT STATUS: ,/PRELIMINARY F4NA-I= Site Plan 1. FYI - This development will need to be coordinated with the proposed Sandy Lake Road improvements. 2. Sidewalk will be required along Riverview Drive. Coordinate the walk with the Sandy Lake Road improvements. 3. FYI - A median opening will not be provided at the driveway onto Sandy Lake Road once the improvements are complete. 4. The grading plan should be prepared so that no runoff is discharged to Sandy Lake Road. Utility Plan 1. Label the 8" waterline along the east property line. 2. The water meters must be located within the right-of-way or in an easement. 3. Show existing and/or proposed fire hydrants. 4. Bullhead meters may not be acceptable. Will verify with Public Works prior to the next DRC meeting. DEVELOPMENT REVIEW COMMITTEE FIRE PREVENTION COMMENTS ITEM: DRC DATE: CONTACT: RIVERVIEW OFFICE DEVELOPMENT, LOT 1 BLK 1 SEPTEMBER 26, 2002 TRA VIS CRUMP, FIRE MARSHAL. (972) 304-3503 COMMENT STATUS: PRELIMINARY 1. Include all fire lane radii calls on plat. Minimum inside radius is 30 feet. Minimum outside radius is 54 feet. 2. On-site fire hydrants will be required. Fire line is to be a looped system. DEVELOPMENT REVIEW COMMITTEE BUILDING INSPECTION COMMENTS Riverview O~ce development DRC DATE: September 26, 2002 CONTACT: Greg Jones, Chief Building O~c~ 004-3500) COMMENT STA TUS: ,~ INITIAL I ~ I 1. No shell comments. No floor plan information providet~ 2. DEVELOPMENT REVIEW COMMITTEE PARKS AND LEISURE SERVICES COMMENTS ITEM: Riverview Office Development, Lot 1, Block 1, Site Plan DRC DATE: September 26, 2002 and October 3, 2002 CONTACT: John Elias, Landscape Manager No comments JE f 0302riverviewsiteplan Comments for the City of Coppell Development Review Committee October 2, 2002 Kivcrvicw Office Development, Lot 1, Block 1, Site Plan Site Plan Acceptable Jeff Curry Oncor Energy Delivery