Construction details@
0
8
-~.
~o
o
0
0
I--
Z
Ld
n
Z
O
O
X
NEW MICROWAVE
CABINET
NEW COAX TO BE STRAPPED TO
THE TOWER W/ 1/2" S.S.
WRAP-LOCK OR APPROVED EQUAL
NEW COAX TO BE ZIP-TIED TO
BOTTOM OF UNISTRUT SUPPORT
NEW PLO00 GALV UNISTRUT
ATTACH TO NEW MICROWAVE
CABINET W/ 5/8" GALV. BOLT
SEAL WEATHERTIGHT
EXISTING MONOPOLE TOWER
ATTACH TO EXISTING TOWER
FOUNDATION W/ (2) 5/8" GALV.
EXPANSION ANCHOR
EXISTING TOWER FOUNDATION
DETAIL
NTS
NOT
DETAIL
NTS
NOT
DETAIL
NTS
USED
USED
I
I
I
** CABINET COLOR TO
BE BEIGE
#4@ 12"
@ Ou OF SLAB
FINAL GRADE
AWAY FROM CONCRETE
PLAN VIEW
--1" CHAMFER (TYP)
--2" ABOVE GRADE
OR PAVEMENT
COMPACTED CRUSHED
STONE OR GRAVEL-
(OPTIONAL; THICKNESS
AS REQUIRED)
END VIEW
--EXCAVATE AS REQUIRED TO
REMOVE VEGETATION &:: TOPSOIL,
EXPOSE UNDISTURBED NATURAL
SUBGRADE &:: PLACE CRUSHED
STONE AS REQUIRED
NOTES: ~
1. FOR CONCRETE NOTES SEE DETAIL
2. GRAVEL SHALL BE NATURAL OR CRUSHED STONE WITH
100 PERCENT PASSING I INCH SIEVE.
CONCRETE PAD FOR
MICROWAVE CABINET
DETAIL
NTS
O'DEA
LYNCH
ABBATTIsTA
NEW YORK ' DALLAS
4230 LBJ Freeway, Suite 625, Dallas, TX 75244
tel 972.239.6100 fax 972.239.6 ! 02
www. olace.com
DENTON TAP RD/BELTLINE
200 E. BELTLINE ROAD
COPPELL, TEXAS 75019
RD
FiberTower
185 BERRY, SUITE 4800
D
C
CONSULTING ENGINEERS
6
S;AN FRANCISCO, CA
4
94107
1 02/28/05 RE-ISSUED FOR CONSTRUCTION
0 01/30/05 ISSUED FOR CONSTRUCTION DS JHR SG
A 01/16/05 ISSUED FOR REVIEW DS JHR SG
NO.j DATE REVISIONS BY CHK ~,PP'I~
SCALE: AS SHOWN DESIGNED BY: dHR I DRAWN BY: DS i
2
O.L.A. PROJECT NUMBER: TFLXO016
CONSTRUCTION DETAILS
SITE NUMBER DRAWING NUMBER
DLS0504 C02
22 x 54 ~IZE
PSC=
B
A