Loading...
Setback of monu. signs memoMarcie Diamond - Amberpoint Signs Page 1 From: To: Date: Subject: Teresa Turner Greg Jones; Marcie Diamond 4/18/03 4:03PM Amberpoint Signs FYI - I just met with Richard Nordyke, Senior Project Manager, regarding the setbacks for the monuments ~igns that will be located at the intersections of Sandy Lake/Northpoint (SE corner) and Royal/Northpoint (NE corner). I verified that the proposed signs as drawn are outside of the required visibility triangle. He wanted to have confirmation of this since the variation for the larger signs specifically address the requirements. Let me know if you have any questions.