Loading...
Landscaping ltr. re Phase One5925 LaVista Dallas: Texas Phone: 2~4.8,g5~7.344 Fax: 214.8268279 chns~chfistof3her-rus.,~ellcc, m May 16, 2003 Mr. Jim Gaspard Transwestem Commercial Services 5001 Spring Valley Road Suite 600W Dallas, Texas 75244 Re Project: Amberpoint Phase One Dear Mr. Gaspard, The area in question, ie., the area to the west of the proposed Bldg One west lot line, to the line shown on the original Building One sgproval which was noted as "Phase linc" was not used in any landscape calculation for Phage One. We I~ave more than enough landscape area as required by the city. We did plant 9 trees at 6" caliper along the Northpoint frontage which falls within the area in question. These trees were planted as require~ perimeter trees and so were counted towards ex/sting tree mitigation at 50% of phnted caliper inch for a total credit of 2?'. After subtracting 27" from our net mitigation credit of 414' we are left with credits of 387" to apply to future phases in the Amberpoint P.D.. A question for the city is since this is a P.D., can we keep the 2T' of cretht? If there are any questions on this, please contact me to di~uss. Landscape Architect Christopher Russell Landscape Architecture