Loading...
P&Z appv'l on 9/19/03 ltr.T H E . C I T Y . 0 F COFFELL June 20, 2003 Mr. Jon Dostert The Holmes Builders 1406 Halsey Way, Suite 100 Carrollton, TX 75007 RE: Case No. PD-181R~ Bethel Road Estates~ Lot Iv Block 1 Dear Mr. Dostert: This letter is to inform you that Case No. PD-181R, Bethel Road Estates, Lot 1 Block 1, zoning change request from PD-I 81-SF-12 (Planned Development- 181, Single Family-12) to PD-181R (Planned Development-181, Single Family-12, Revised) to allow for a stucco finish instead of masonry as required in Section 12-11-5 of the Zoning Ordinance, on 0.863 of an acre of property located at 260 West Bethel Road, was recommended for approval by the Coppell Planning and Zoning Commission on Thursday, June 19, 2003, subject to the following conditions: 1) One curb cut will serve this and the adjacent lot to the east. 2) A circulation plan that allows all vehicular maneuvering on the lots and not on Bethel Road (read: no backing into Bethel Road). 3) Provision of a landscape plan for this lot which locates 21 caliper inches (DBH) of trees as required in the original PD. (See Parks Department comments, attached). 4) Compliance with all other conditions of the original PD. The date scheduled for consideration by the Coppell City Council is Tuesday, July 8, 2003, at 7 p.m. A representative for this case must be present at this meeting, which will be held in Council Chambers at City Hall. Failure to represent this item may result in the denial of this application. City Council has instructed staff to include in its agenda packets 255 PARKWAY * P 0 BOX 9478 * COPPELL TX 7501g ~ TEL 972/462 0022 ~- FAX g72t30,~ 3673 only those items that accurately reflect conditions as recommended by the Planning and Zoning Commission. Therefore, please submit to the Planning Department three folded copies of a Landscape Plan on or before 12 noon~ Wednesday~ June 25th. Also, please submit one (1) 8 1/2 x 11 paper reduction, along with one jpeg, tifor similar electronic file. If you have any questions, please contact the Planning Department at (972) 304-3678. Sincerely, [}jrector of Planning Cc Building Inspection file Fr~m: John Elias To: Gary Slab Date: 6/1 tl03 3:39PM Subject: PD 181 - Beth.t R~ Estatas Gary, The original tree mitigation plan for Eiethal Es~3tas called for 86 OBH to be plen~ed to offset the 86 removed for development prior to · c~tlficate of occupancy given. Each of the 2 lots was to have a minimum of 43 DBH to o;;se/the tree removal. In ¢liscus~ons with Ten'y Holmes it has been determined that 44 DBH out of the odginal 86 DBH to be removed, can now be saved. This changes the tree mitigation plan to be the following: 42 DBH to be planted to offset the 42 removed for developmeM prior to a certificate of occupancy given. Each of the 2 lots is t~ have a minimum of 21 DBH to off set the tree removal, If ~ls is not clear, or you need any mom informatJofl, please call me, ThartK You John Elias Pa~s Oepartment