Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
LP, Lots 1R&2, Blk. A, L2.0
IIII TGI~ ©F: I~OOT t~ALL TO t~,E 1" TO 2" AI~OYE F:[NIS~EID GRx~IDE. I--IALF T~E LUIOT!--4 OF: TREE ROOT BALL -I'IINH"1UP1 ]12" I.~. NOSE TO / F:>ROTEC. T T~:EE T~Nt~-.. (~,EE PLANTINC~) GAUGE BUILDING 1 EXPANSION (LOT 1RI PLANT SCHEDULE i II Illl Ill I OTY COMMON NN~tE BOTANIC NAME SIZE O INSTALLATION SPACING/ NOTES 44 LIVE OAK (LO) Ouercus virg;n;ono 5" Cal. As Shown/ MATCHING 60 CEDAR ELM (CE) Ulmus crosslfol;o 5" Cot. As Shown/ MATCHING 19 BALD CYPRESS (BE) Toxodlum d~st;chum 5" Cot. As Shown/ MATCHING 56 CRAPE MYRTLE (CM) Logerstroe.m;o ;nd;co 'Dollos~ Red' 8' Hi. As Shown/ MATCHING 271 Dwf. BURFORD HOLLY Ilex coDnuto 'BurfoDdll nono' 7 Col./50 Ht. Min. 56" D.C. 155 NELLIE R. STEVENS HOLLY Ilex X Netl;e R. Stevens 6' Ht. 5' D.C. BERMUDA GRASS Cynodon doctylon Hydromulch BUILDING 2 (LOT 2) PLANT SCHEDULE QTY COMMON NAME BOTANIC NAME SIZE 0 INSTALLATION SPACING/ NOTES 167 LIVE OAK (LO) Ouercus virg;n;ono 3' Col. As Shown/ MATCHING Uimus crosslfolo 5' Co,I. Toxodium dlsUchum 5" Col. 210 CEDAR ELM (CE) 140 BALD CYPRESS (BE) 119 CRAPE MYRTLE (EM) Logerstroem;o ;nd;co 'Dollos Red' 8' Ht. 506 Dwf. BURFORD HOLLY Ilex cornuto 'Burfordil nono' 7 0ol./50' Hi. Min. 56" D.C. 65 NELLIE R. STEVENS HOLLY Ilex X Neil;e R. Stevens 6' Ht. 5' D.C. BERMUDA GRASS Cynodon doct¥1on Hydromulch As Shown/ MATCHING As Shown/ MATC:HI,NG As Shown/ MATCHING I I I I 215-A N. Oak St. Roanoke, TX 782'82 TEL: (817)430-3382 FAX.' (817).491 -I 969 r'IULCI.-4 TREE U;ELL &'" AE~O",/E ROOT E~ALL ESACKJ:::ILL F::>LANTING PIT UJ/ ~,OIL 4 ,SATURATE UJ/ TO ELIMINATE (USE :~ F:'O~T5 PER TREE) OF TREE PIT TF EE PLANTIN 4 5TAKIN I ETAIL DUCE (:INLY IP I~E<:2UlI~ED AvE I~ SANDY LAK~= ROAD NO SHALE LANDSCAPE NOTES 1.ALL LANDSCAPE REQUIREMENTS AND UNDERGROUND IRRIGATION SYSTEM W~ILL CONFORM TO THE CITY OF' COPPELL ORDINANCE DESIGN STANDARDS iF APPUCABLE. 2.NO PLANT MATERIAL SHALL BE PLANTED UNT1L THE LANDSCAPE IRRIOATIOIN SYSTEM HAS BEEN INSTALLED AND IS OPERATING WITH 100~. COVERAGE OF PROPOSED LANDS,CAPE AREAS INCLUOING THE FULL R.O.W. 3, LANDSCAPE CONTRACTOR SHALL 8E RESPONSIBLE FOR MAKINO HIMSELF FAMILIAR WITH ALL UNDEROROUND UTILITIES, PIPES, STRUCTURES AND LINE RUNS. 4, CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF' ALL QUANTITIES BASEIO ON THE DRAWIN0(S) AND ACTUAL FIELD DIMENSIONS. PLANT QUANTITIES HAVE BEEN PROVIDED AS A CONVENIENCE ONLY TO THE OWNER(S) AND SHALL NOT BE CONSIDERED ABSOLUTE, 60MITRACTOR SHALL FOLLOW DESIGN iNTENT. 5, ALL PROPOSED SUBSTITUTIONS MUST BE APPROVED BY THE LANDSCAPE A, RCHITECT PRIOR TO LNSTALLATI.ON. 6. NOTIFY LANDSCAPE ARCHITECT IF LAYOUT OF' TREES. BEDS AND/OR PLAN'TS REQUIRE ALTERATION FROM LANDSCAPE PLAN. NOTIFtCATi0N WILL BE REQUIRED PRIOR TO ALTERING LAYOUT. 7. TREES SHALL BE HANDLED BY ROOT BALLS ONLY. DO NOT DAMAOE BALL, TRUNK, OR LOOSEN TRUNK FROM BALL. TREE TRUNKS ARE TO BE PLANTED STRAIGHT AND MAY BE REQUIRED BY THE OWNER AND/OR LANDSCAPE ARCHITECT TO BE STAKED. &ALL TREES REQUIRED TO B;E STAKED AND GUYED SHALL CONTINUE TO BE SO THROUGH THE WARRANTY PERIO0 AT WHICH T1ME THE OWNER AND/OR LANDSCAPE ARCHITECT SHALL DETERMINE IF REMOVAL IS APPROPRIATE. 9. ALL TREES LOCATIONS SHALL BE APPROVED BY OWNER OR OWNER'S REPRESENTATIVE PRIOR TO PLAN TiNO, 10,AT NO T1ME WILL ANY PLANT MATERIAL BE ALLOWED TO SETTLE BEYOND TOP OF ROOT BALL OR POTTED SOIL LINE, SHOULD PLANT MATERIAL SETTLE, THE PLANT(S) WILL BE REPLANTED AT THE PROPER HEIGHT AND/OR REPLACED IF NECESSARY AT THE CONTRACTOR'S COST, 11. ALL PROPOSED BED AREAS SHALL BE TILLED TO A DEPTH OF 6". ADOING A :3' MIN, LAYER OF ORGANIC COMPOST DUR1NO THE PROCESS. THE LEVEL OF THE BED AREAS SHOULD BE LEFT ,,3" ABOVE THE PROPOSED FINISHED GRADE TO ALLOW FOR COMPACTION AJND SETTLEMENT. 12.ORGANIC COMPOST IS TO B:E PROVIDED BY LiViNG EARTH TECHNOLOGY OR APPRO~D SUPPLIER, 13, ALL BED AREAS SHALL BE SEPARATED FROM TURF AREAS USING 1/8"x4" PRO STEEL EDGING, ALL ENDS OF STEEL EDGE RUNS SHALL HA~ A RADIUS OR 45' ANOLE TO ELIMINATE SHARP EDGES, HAND FILING MAY BE REQUIRED TO ACHtE~ A SMOOTH EDGE, 14. TRIM STEEL EDGING AT A 45' ANGLE ~EN EDGING INTERSECTS ~TH A WALK OR CURB, 15, ALL LANDSCAPE BEDS SHALL RECEI~ A 2" TOP DRESS LAYER OF SHR'ED~ED HARDWOO0 MULCH AND ALL TREE ~LLS SHALL RECEIVE A 3" TOP DRESS LAYER OF SHREDDED HAROWOO0 MULCH, 16. TURF AREAS SHALL BE CLEAN OF DEBRIS AND RAKED (ORADED) SMOOTH PRIOR TO HYDROMULCH OR SOO INSTALLATION. LANDSCAPE CONTRACTOR TO RECEI~ ORADE FREE OF ROCK AND DEBRIS ~THIN APPROX. 1/10 th OF AN INCH OF FINAL GRADE. 17. OWNER RESPONSIBLE TO PRO,DE ELECTRICAL SER~CE FOR IRRIGATION SYSTEM. ~ICH INCLUDES A HARD.RE OF 110 VOLTS AT MINIMUM FOR THE CONTROLLER. 18, IRRIGATION ~LL BE AN AUTOMATIC UNDERGROUND SYSTEM ~TH AUTOMA~TIC CONTROLLER. RAIN GAUGE AND FREEZE GUARD. ,9. DUMPSTER ~LL BE SCREENED AS PER THE CITY 0¢ COPP[LL, 20. ALL LANDSCAPING LOCATED ~THIN THE ~SIB~LITY TRIANGLES SHALL COMPLY ~TH T.E ~SIBIUTY TRIANGLE REQUIREMENTS AS PER THE OTY OF COPPELL L.ANOSCAPE 2,.ALL TREES TO BE UNIFORM BY SPECIES ~TH STRA, OHT TRUNKS AND MATCHING CHARACTER AND 22. ALL SOO IS LAYED BET~EN SEPTEMBER 1 - APRIL 14 AND H~ROMULCH IS SPRAYED BET~EN lF HYOR M L H R U~A , PE ,FIE PRO CONTRACT *LL NOT INCLUDE A CONV~RSION FROM THE R~ TO THE BER~UBA. THIS CON~*SION T NF T ~ER1CAN 24. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO REFUSE ANY LANDS(CAPE MATERIAL ON SITE. 25. ALL PLANT MATERIAL SHALL BE BID AS CONTAINER/NURSERY GROWN. LANDSCAPE TABLE BUILDING 1 EXPANSION 1. INTERIOR LANDSCAPE REQUIRED 10'~, OF' ENTLRE PARKING 1 TREE/ 400 SF OF REQUt:RED iNTERIOR LANDSCAPE INTERIOR LANDSCAPE PROVIOED 21~ OF ENTIRE PARKING 21~, OF 156,07B SF= 28,8,00 SF 156,078 SF 10% OF 136,078 S,F'= 13,508 SF 13,608 SF/ 400 SF= 54 TREES 54 TREES REQUIRED 55 TREES PROVIDED (on s;te) PERIMETER LANOSCAPE AREA REQUIRED CREEKV1EW DRIVE PERIMETER LANDSCAPE TREES REQUIRED 1/ 50 LF 0F PERIMETER PERIMETER LANDSCAPE TREES PROVIDE D WEST PROPERTY LINE PERIMETER LANDSCAPE TREES REQUIRED 1/ 50 LF OF PERIMETER PERIMETER LANDSCAPE TREES PRODDED LANDSCAPING REQUIRED FOR NONVEHICULAR OPEN SPACE 15% OF LOT NOT COVERED BY ~UILDINGS LANDSCAPING PROVIDED FOR NONVEHICULAR OPEN SPACE 21,230 SF 952 LF 19 TREES REQUIRED g32 LF/ 50 LF=lg TREES 29 TREES PROVIDED 725 LF 15 TREES REQUIRED 725 LF/ 50 LF=15 TREES 15 TREES PROVIDED 58,474 Si:' 15% OF 58g,824 SF = 58,474 SF 5g,580 SF 15.2~ OF' 389,824 4. TREES REQUIRED FOR NONVEHICULAR OPEN SPACE 1 TREE/ 2500 SF TREES PROVIDED FOR NONVEHICULAR OPEN SPACE 25 TREES REQUIRED 58,474 SF/ 2500 SF 25 TREES PROVIDED 5. TOTAL TREES REQUIRED: 91 TREES REQUIRED TOTAL TREES PROVIDED: 125 TREES PROVIDED COMPLETE SUMMARY BUILDING 1 (;LOT 1RI LANDSCAPE 1. PERIMETER LANDSCAPE BUFFER REQUIRED PROVIDED LOT 1 69,400 S,F 69,400 S;F TABLE 2. INTERIOR LANOSCAPE REQUIRED PROVIDED LOT 1 1~,5oa sF (10~,) 17,975 SF OPEN SPACE REQU LRE D PROVIDE D LOT 1 58,474 SF (15%) 59,575 SF 4. TOTAL 141,482 SF 146,950 LANDSCAPE TABLE LANDSCAPE TABLE (LOT 2) 1. INTERIOR LANDSCAPE REQUIRED 10% 0F ENTIRE PARKING 1 TREE/ 400 SF OF REQUIRED ~NTERIOR LANOSCAPE 846,966 SF 10~ OF 846,966 SF= 84,696 SF 84,696 S,F/ 400 S.F= 212 TREES 212 TREES REQUIRED INTERIOR LANDSCAPE PROVIDED 11% OF ENT1RE PARKING 11,5~ OF 846,966 S.F= 97,115 SF 212 TREES PRO~DED OWNER HILLWOOO ENTERPRISES, L,P, 5310 LBJ FRWY,, SUITE 800 DALLAS, TEXAS 75240 PHONE: (972)201o2964 FAX: (972)201-2989 CONTACT: JENNIFER DICKS ARCHITECT PGA ARCHITECTS 215-A NORTH OAK STREET ROANOKE, TX 76262 PHONE: (817)430-3382 FAX: (817)491-1969 CONTACT: RICK GILLILAND, AIA LANDSCAPE ARCHITECT MYCOSKIE + MCINNIS + ASSOCIATES, INC. 200 E. ABRAM STREET ARLINGTON, TEXAS 76010 PHONE: (8,17)469-1671 FAX: (817)274-8757 CONTACT: JOE SARABIA, PLA PERIMETER LANDSCAPE AREA REQUIRED 75,660 SF BETHEL ROAD PERIMETER LANDSCAPE TREES REQUIRED 1/ 50 LF OF PERIMETER PERIMETER LANDSCAPE TREES PROVIOED 1.101LF 22 TREES REQUIRED 1,101 LF/ 50 LF=22 TREES 22 TREES PROVIDED FAST PROPERTY LANE PERIMETER LANDSCAPE TREES REOUIRED 1/ 50 LF OF PERIMETER PERIMETER LANDSCAPE TREES PROVIDED 2,189 LF 44 TREES REQUIRED 2,189 LF/ 50 LF=44 TREES 44 TREES PROVIDED CREEKVIEW DRIVE PERIMETER LANDSCAPE TREES REQUIRED 1/ 50 gF OF PERIMETER PERIMETER LANDSCAPE TREES PROVIDED 1,085 LF 22 TREES REQUIRED 1,085 LF/ 50 LF=22 TREES 54 TREES PROVIDED WEST PROPERTY LINE PE,RIblETER LANDSCAPE TREES REQUIRED 1/ 50 LF OF PER]METER PERIMETER LANDSCAPE TREES PROVIDED 2,098 LF 42 TREES REQUIRED 2,098 LF/ 50 LF=42 TREES 48 TREES PROVIDED (ALSO USED FOR ~NTERIOR PARKING TREES) 5. LANDSCAPING REQUIRED FOR NONVEHICULAR OPEN SPACE 15% OF LOT NOT COVERED BY BUILDINGS LANDSCAPING PROVIDED FOR NONVEHICULAR OPEN SPACE 156,854 SF 15~ 0g 1,045,555 SF = 156,854 SF 579,140 SF 36~ OF 1,045,565 4. TREES REQUIRED FOR NONVE:HICULAR OPEN SPACE 1 TREE/ 25oo SF TREES PROVIDED FOR NONVEH~CULAR OPEN SPACE 65 TREES REQUIRED 158,8J4 SF/ 2500 SF 2~4 TREES PROVIDED 5, TOTAL TREES REQUIRED: TOTAL TREES PROVIDED: 405 TREES REQUIRED 526 TREES PROVIDED COMPLETE SUMMARY BUILDING 2 (LOT 2) LANDSCAPE TABLE 1. PERIMETER LANDSCAPE BUFFER REQUI'RE D PROVIDED LOT 2 75,s6o SF 75,650 SF 2. INTERIOR LANDSCAPE REQUIRED LOT 2 B4,~96 SF (lo~,) P ROV1D,E D g7,115 SF 5. OPEN SPACE REQUIRED LOT 2 156,855 SF (15~,) PROVIDED 37g,140 SF 4. TOTAL REQULRED 517,191 SF PROVIDED 551,915 SF FOR PERMIT ONLY Z MMA PROJECT NO.: 2033--0-1 D ATE: 10102/2003 mtmla mycoskde, mcinnis+ associates civil engineering surveying ra~dscal;o archi,octure piannir~ 200 oa~t abram arlington, texas 70010 017-450-1571 fax, LANDSCAPE PLAN COPPELL INDUSTRIAL DISTRICT LOTS 1R & 2 BLOCK A L2.O