SP reflecting CC conditionso
o
o
o
._J
Z
Location Map.
ZONING: HC
-- FUTURE DRIVE' __
ZONING: PD-134R
SF 7
20' U'
/
/
/ ,/
~--./----~ PROP. F1RE
FUTUREDRIVE-C/.' I ~Y[ ~
EX]STiNg 4.0'x100' ~ '"'' '
DRAIN, AGE EASEMENT~
- - x ~ 20' UT~L.
/0
PROP. F1RE DEPT.
,30'
27,96'
T
20'
9 SPACES
/ / /
7'1 2"W
/
Lot 18X
ZONING: PD-154R
SF 7
.s 24.'
20' Lmb ~
24.'
ACCESS ' :,
: ~ ~ F-JB.E-1.~4 E--1[2~-~¢1ENT ,,
HYDRANT
107.46'
/
DRIVE
/
./
Lot 1
EASEMENT
4.0'
/
:4'
ZONING: HC
~ ~ 12' HIGH UG
,,, / ~ ~ POLE W/ SHOE BOX
,,, -" / STYLE FtXTU:RE. TYP.
EX. 3o'~%G7. o.
2-6'x9'
CONC. BOX CULVERT
24'
' ': 105'
10'
CU RB~_JN4_ET__~~
STAMPED 8~ STAIN:ED CONCRETE: %
PATTERN: RUNNING BOND USED BRICK
COLOR: RED CLAY-BOMAN:ITE INTERGRAL COLOR ~
ANO PROVIDE 1' ACCENT BAND
COLOR: gUNMETAL GRAY-BOMANITE INTEGRAL COLOR
Service Road
(West Bound)
L
EASEMENT
-_-LERATION LANE
125.46'
IN!LET
CURB
St.c[c
Highway
1
21
(Variable Width ROW)
20' 0 20' 40'
Scale 1"= 20'
LEGEND_
EXISTING
DESCRIPTION
PROPERTY LINE
BUILDING FOOTPRINT
CONC. CURB & GUTTER
EDGE OF PAVEMENT
CONC. PAVEMENT
CONC. SIDEWALK
LIGHT POLE
NEW
Coppell/121 Office Park- Site Data Table
Site Characteristics
Zoning
Proposed Use
Lot Square Footage
Building Square footage
Required Parking (1/300 sf)
Provided Parking
Proposed Lot Coverage
Percent Lot Cove:rage
Proposed LandScape Area
Highway Commercial
Business/Office
50,491
8,288
28
34
27,831
55%
22,660
GENERAL NOTES
1. ALL LINES, GRADES, CONSTRUCTION STAKING AND
LAYOUT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
2. PRIOR TO BEGINING CONSTRUCTION, CONTRACTOR
SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND
REPORT ANY DISCREPENClES TO THE OWNER'S AGENT.
¢. ALL DIMENSIONS ARE TO FACE O:F CURB, EDGE OF
PAVEMENT, OR FACE OF CONCRETE BUILDING FOOTING.
4. EXISTING UTILITY DATA IS PROV1DED FOR INFORMATION
OiNLY. ALTHOUGH SHOWN AS ACCURATELY AS POSSIBLE,
THE CONTRACTOR tS RESPONSIBLE FOR COORDINATING
WITH MUNICIPAL AND FRANCHISE UTILITY COMPANIES
AND LOCATING ALL UTiLITiES IN THE FIELD.
CONSTRUCTION NOTES
1. ALL CONSTRUCTION SHALL BE DONE IN ACCORDANCE
WITH THE NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENT
AND THE CITY OF COPPELL STANDARD DETAILS AND
CONSTRUCTION SPECIFICATIONS.
2. CONTRACTOR SHALL COORDINATE AND PAY FOR ALL
UT1LITY WORK TO BE DONE BY CITY FORCES AND/OR
FRANCHISE UTILITY COMPANIES.
~. ALL DIMENSIONS ARE PARALLEL OR PERPENDICULAR
TO THE STATE HIGHWAY 121 RIGHT OF WAY, BEARING
N65"58'1 8"W.
0 0 0
%% Ld 0
F- k-- Or) 0 %/
Z Z Z
Ld Ld 0
0 Ld
Z rF
Ld 0
o4,-6 c~ <
Z
I
II
I&l
IL O
THiS DOCUMEN? iS
RELEASED FOR THE
PURPOSE OF-,NT~_R,M
REVIEW UNDER THE
AUTHORIT~F OF
KONSTANT~NE BAK!NTAS,
P.E. TX No, 67022 IT ;S
NOT INTENDED FOR
CONSTRUCTION, B:DDiNG
OR PERMIT PURPOSES
ill i
BHB PROJECT NO:
2003.28.010
SHEET