Loading...
Approved by CC on 2/10/04AGENDA REQUEST FORM COl'FELL DEPT: Planning DATE: February 10, 2004 ITEM #: 10 ITEM CAPTION: Consider approval of the Brighton Manor, Final Plat, to allow a 26-1ot single-family subdivision, and eight common area lots, on 10.16 acres of property zoned SF-9, located at the southeast comer of Samuel and MacArthur Boulevards. Motion to Approve, subject to conditions 1, 2, 3 & 4 below. APPROVED BY CITY COUNCIL ON ABOVE DATE GOAL(S): EXECUTIVE SUMMARY: M - Brancheau - Raines ote - 5-0-1 York absent. Suhy abstained by filing a conflict of interest affidavit. Date of P&Z Meeting: January 15, 2004 Decision of P&Z Commission: Approved (6-0) with Commissions Milosevich, Kittrell, Halsey, Borchgardt, Foreman and Reese voting in favor. None opposed. Approval is recommended, subject to the following conditions: 1) Contact Kemp Spears at (972) 888-1330 to discuss utility easement requirements. 2) Locate fire hydrant shown at comer of Hood Drive and Hood Drive approximately 80 feet west to the comer of the cul-de-sac. 3) Provide a drainage easement across Lot 2-X, Block A, or the entire lot 2-X, Block A should be noted as a drainage easement. 4) Agreement between the Lakes of Coppell Owners Association and the developer of mutually agreeable wall/landscape area maintenance. Staff recommends approval. DIR. REVIEW: FIN. REVIEW: ~ ~i CM REVIEW: Digitally signed by Jim Witt DN: Agenda Request Form - Revised 09/02 Document Name: ~2BrightonM FP I-AR CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE: Brighton Manor Final Plat P & Z HEARING DATE: C.C. HEARING DATE: January 15, 2004 February 10, 2004 STAFF REP.: Gary L. Sieb, Planning Director LOCATION: At the comer of Samuel and MacArthur Boulevards. SIZE OF AREA: 10.16 acres of property CURRENT ZONING: SF-9 (Single Family-9) REQUEST: Final Plat approval to allow a 26-1ot single-family subdivision and eight common area lots. APPLICANT: Street Real Estate LTD dba Geometric Land Group John Speanburg 1660 S. Stemmons Freeway, Suite 295 Lewisville, TX. 75067 (972) 745-7307 FAX: (972) 745-7118 Engineer: Dowdey, Anderson and Associates, Inc. Scott Caruthers 5225 Village Creek Drive, Suite 200 Piano, TX. 75093 (972) 931-0694 FAX: (972) 931-9538 Page 1 of 3 Item #6 HISTORY: TRANSPORTATION: This property was purchased by the Coppell Independent School District in the early 1990's as a proposed elementary school site. In a recent review of enrollment figures and projections, it was detemfined that the District did not need to build another elementa~ school, and this 10 acre parcel was put out to bid. Street Real Estate LTD was the successful bidder, and shortly after purchase a preliminary plat application was submitted for City review m~d approved. This is the final plat application. MacArthur Blvd. is an improved P6D, six-lane divided thoroughfare contained within a 100-foot r-o-w. Samuel Boulevard is a C2U, two-lane tmdivided street contained within a 60-foot r-o-w. SURROUNDING LAND USE & ZONING: North- single-family residences; PD- 137 South single-family residences; SF-9 East- church; SF-9 West- single-family residences; PD-141 COMPREHENSIVE PLAN: The 1996 Comprehensive Master Plan shows the property as suitable for an elementary school site; prior to 1996, it was shown as single-family property. DISCUSSION: Page 2 of 3 As discussed when the preliminary plat was reviewed: "In recent months, staff has seen an increase in developers opting to go through the platting procedure to have their plans reviewed, as opposed to going the zoning route with the Planned Development process. The reason for this is evident--no advertised public hearings that might generate neighborhood opposition, and a review process which is much more expedient. As a general rule, staff would prefer development proceeding through the PD process, whereby adjacent landowners have more opportunity to express their wishes, and development proposals can be customized for each proposed subdivision. But in certain instances, we can support the platting route. This is one of those instances. First, the density proposed in this development is much less than that in any of the established neighborhoods adjacent to it. Second, comprehensive plans developed prior to our most recent 1996 Plan called out residential development for this parcel. Third, it is currently zoned for residential use. Fourth, the use proposed is certainly compatible with what has developed around it. For these reasons, staff has no objection to this plat. In addition, this plan contains a brick screening wall with exterior Item #6 landscape plantings and is compatible with the existing wall along the length of MacArthur Boulevard. The plan includes eight common landscape areas to complement the 26 single-family lots, and the monument markers give the project a favorable identity. There are some technical concerns that need to be addressed, and we list them under conditions for approval. As a final comment relative to this proposal, the Lakes of Coppell Homeowners Association has recently advised us that this property is a part of the overall Lakes Association. As such, the Association has some concern regarding maintenance of the proposed landscape areas and screening walls. It is the Association's position that they do not want to assume any more landscape/maintenance responsibilities. The Brighton Manor development could have an independent H.O.A. to address the concerns of the Lakes Association. Staff is not concerned how the property is maintained, as long as it is maintained to a high standard. Therefore, we have added a condition of approval that the Association and this developer agree to mutually acceptable landscape and wall maintenance." The developer agreed to all our conditions at the preliminary plat review and reflects those agreements on this final plat document. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff is recommending approval of this request with the following conditions: 1. Contact Kemp Spears at (972) 888-1330 to discuss utility, easement requirements. 2. Locate fire hydrant shown at comer of Hood Drive and Hood Drive approximately 80 feet west to the comer of the cul-de-sac. 3. Provide a drainage easement across Lot 2-X, Block A, or the entire lot 2- X, Block A should be noted as a drainage easement. 4. Agreement between the Lakes of Coppell Owners Association and the developer of mutually agreeable wall/landscape area maintenance. ALTERNATIVES 1) Recommend approval of the request 2) Recommend disapproval of the request 3) Recommend modification of the request ATTACHMENTS: 1) Final Plat document })age 3 of 3 Item//6