Loading...
CC approval on 12/9/03AGENDA REQUEST FORM COPPELL DEPT: Planning DATE: December 9, 2003 ITEM #: 12 ITEM CAPTION: PUBLIC HEARING: Consider approval of the Coppell Industrial Addition (Tradepoint), Lots 1R and 2, Block A, Replat and Final Plat, being a replat of Lot 1, Block A, and a Final Plat of Lot 2, Block A, on 98.84 acres of property to allow for an approximate 350,183 square-foot expansion to the existing 600,000 square-foot building on Lot 1R and the development of an approximate 952,094 square-foot office/warehouse building on Lot Lane; north of Bethel Road. APPROVED BY GOAL(S): CITY COUNCIL ABOVE DATE EXECUTIVE SUMMARY: located 50' east of Ro ,al Motion to close Public Hearing and Approve M - Brancheau -Faught ore - 6-0 runnell absent Date of P&Z Meeting: November 20, 2003 Decision of P&Z Commission: Approval (6-0) with Commissions McCaffrey, Miiosevich, Kittrell, Borchgardt, Foreman and Reese voting in favor. None opposed. Approval is recommended, subject to the following conditions: (CONDITION MET) 2) Additional easements may be required during the engineering review process. 3) Provision of easements as may be required by franchise utility companies (i.e., Oncor/Comcast/Verizon). Staff recommends approval. DIR. REVIEW: FIN. REVIEW: al, CM REVIEW:,.~ .... ~o~oo ..... Agenda Request Fon~ - Revised 09/02 Document Name: ~4CI,LIR&2,BA RPL&FP I-AR CASE: CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT Coppell Industrial Addition (Tradepoint), Lots 1R and 2, Block A, Replat & Final Plat P & Z HEARING DATE: C.C. HEARING DATE: November 20, 2003 (Denied at the P&Z Meeting on 10/16/03) December 9, 2003 STAFF REP.: Marcie Diamond, Assistant Planning Director LOCATION: 50' east of Royal Lane; north of Bethel Road. SiZE OF AREA: 98.84 acres of property, being a Replat of 45.36 acres and a Final Plat of 53.48 acres. CURRENT ZONING: PD-185-LI (Light Industrial) REQUEST: Replat Lot 1, Block A to allo~v an expansion to an existing building, and Final Plat Lot 2, Block A, for the development of an office/warehouse building. APPLICANT: Page 1 of 4 O wner: Architect: Hillwood Funds No. 1 LP Three Lincoln Centre 5430 LBJ Freeway, Suite 800 Dallas, Texas 75240 (972) 847-1422 FAX: (972) 201-2989 Rick Gilliland RGA Architects 215 N. Oak Street, Suite A Roanoke, Texas 76262 (817) 430-3382 Item # 7 Engineer: FAX: (817) 491-1969 Stephen Crawford Halff Associates, Inc. 4000 Fossil Creek Blvd. Fort Worth, TX 76137 (817) 847-1422 FAX: (817) 232-9784 HISTORY: In May 2000, Council approved PD-185-LI to allow for the development of two office/warehouse buildings on approximately 100 acres of property. Phase One of this development was proposed to contain a 600,000 square-foot building with a 350,000 square-foot future expansion area. Phase Two anticipated a 900,000 square-foot building. This PD included various conditions including: a reduction in the required parking for warehouse uses, tree mitigation and allowing for a single 120 square-foot monument sign, in lieu of two 60 square-foot signs. Council also approved a Preliminary Plat for the entire acreage and a Final Plat to allow for Phase One construction. Since that time, staff has administratively approved a revision to the site plan to allow for 50 additional parking spaces along Bethel Road, east of Royal Lane to serve the 150 Mohawk employees. TRANSPORTATION: Bethel Road is currently a two-lane asphalt road; however, it is designated on the Thoroughfare Plan as a C4D to be built within 90' to 100' R-O-W. Construction documents are currently being prepared to improve this road to a 4-lane divided concrete thoroughfare. Improvements are scheduled to start in the second quarter of 2004 and be completed in the third quarter of 2005. SURROUNDING LAND USE & ZONING: COMPREHENSIVE PLAN: Page 2 of 4 North -Wagon Wheel Park; LI (Light Industrial) South - Postal Distribution Center; LI (Light Industrial) East - U-Line; LI (Light Industrial) West-Sun Dial, TNA, Craflmade International; Industrial) LI (Light The Comprehensive Plan of May 1996 shows the property as suitable for Light Industrial/Showroom uses. Item# 7 DISCUSSION: As mentioned in the HISTORY section, this entire tract was preliminary platted into two lots, and a Final Plat for the first phase of development was approved at that time. This request is to replat Lot 1 into LotlR, incorporating the additional 14.98 acres of property to allow for the expansion of the Building 1, and to final plat the remaining 53.48 acres to allow for the construction of the second building. The replat of Lot 1 will involve the abandonment of an existing platted fire lane and landscape easement, which will be relocated to the north side of the expanded building area. The common access easements and adjacent 10-foot landscape easements have also been expanded to serve both buildings in their ultimate configurations. Along the eastern side of this plat, there is an existing 8.47-acre landscape and detention easement, which was established through a private agreement between Champion and Duke-Weeks on December 22, 2000. Therefore, this 8.47-acre drainage and detention easement and the proposed 20-foot easement running parallel to Bethel Road are not required and need to be removed from the Plat. These easement areas will continue to be privately maintained per the existing agreement. The notations on the plat are still stating that these easements are to be "dedicated by this plat". So there is no confusion in the future as to the maintenance responsibility for these drainage areas, staff is recommending that these notes be revised from "dedicated by this plat" to "as established by private agreement." The construction documents for the improvements to Bethel Road are currently under design. An additional .047 of an acre of property is needed for additional R-O-W at the southwest corner of the tract, which is being dedicated by this Plat. The Engineering Department is also coordinating with the owners of this tract to provide for temporary easements needed for the construction of Bethel Road. R~COMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff is recommending APPROVAL of Coppell Industrial Addition (Tradepoint), Lots 1R and 2, Block A, Replat & Final Plat, subject to the following conditions: ~.~.~A TM *~,~ ~5. .~v~ a:r~g. (corrected) 2) Deletion of the proposed dedication of the 8.47-acre drainage and detention easement along the eastern property line and the proposed 20-foot easement running parallel to Bethel Road. Item # 7 Page 3 of 4 These will continue to be privately maintained. Revise the notations from "dedicated by this plat" to "as established by private agreement" 3) Additional easements may be required during the engineering review process. 4) Provision of easements as may be required by franchise utility companies (i.e Oncor/Comcast/Verizon). ALTERNATIVES 1) 2) 3) Recommend approval of the request Recommend disapproval of the request Recommend modification of the request ATTACHMENTS: 1) Replat and Final Plat Page 4 of 4 Item//7 i N II L ! 1 i