P&Z 10/16 denial ltr.cOPPEEL
October 17, 2003
Mr. Albert Jerrell
Hillwood Funds No. 1 LP
Three Lincoln Centre
5430 LBJ Freeway, Suite 800
Dallas, TX 75240
RE: Coppell Industrial Addition {Tradepoint)~ Lots IR and 2~ Block A~ Replat and Final Plat
Dear Mr. Jerrell:
This letter is to inform you that on October 16, 2003, the Coppell Planning Commission denied the
Coppell Industrial Addition (Tradepoint), Lots 1R and 2, Block A, Replat and Final Plat, being a replat
of Lot 1, Block A, and a Final Plat of Lot 2, Block A, on 98.84 acres of property to allow for an
approximate 350,183 square-foot expansion to the existing 600,000 square-foot building on Lot IR and
the development of an approximate 952,094 square-foot office/warehouse building on Lot 2 located 50'
east of Royal Lane; north of Bethel Road.
This request can be brought back for consideration at the Commission's November 20, 2003, meeting.
We suggest that you incorporate into your submission staffs recommendations as listed on the Staff
Report. Two sets of revised plats need to be submitted to the Planning Department on/or before 12 noon,
Wednesday, October 29th, for staff review.
Sincerely,
Marcie Diamond
Assistant Director of Planning
Cc Rick Gilliland, RGA Architects
Stephen Cra~vford, Halff Associates, Inc.
Building Inspection
file