Loading...
CC 7/6/04 approval letterJuly 7, 2004 Mr. Brian Straley Duke Construction, L.P. 5495 Beltline Road, Suite 360 Dallas, TX 75254 RE: Case No.: PD-186R6-LI~ Duke-Freeport [)ear Brian:: This letter is to in1~brm you that Case No. PD-186R6-LI, Duke-Freeport, zoning change requesl from PD-186R3-LI (Planned Development-186 Revision 3-Light Industrial) to PD-186R6-LI (Plarmed Development-186 Revision 6-Light Industrial), to attach a Detail Site Plan to Lots 6 and 7 (fonnally Building 3), to allow the construction of a 140,000-square-foot building on Lot 6 and a 70,000-square-foot building on Lot 7, totaling approximately 14.13 acres of property located along tiao west side of Freeport Parkway, south of Creekview Drive, was approved by the Coppell City Council on Tuesday, July 6, 2004. subject to the following condition: 1) Make sure visibility issues are addressed for the median openings when the left turn lanes are completed. Some of the trees may be within a visibility area. In order to prepare an Ordinance, we need to assemble appropriate documentation. 'C/hen this has been co~npleted and Council has approved the Ordinance, a copy x~ill be sent to you. As a reminder, the zoning change sign can no~r be returned to the Planning Department for your deposit reimbursement of $150. if you have an3' questions, please contact the Planning Department at (972) 304-3678. ector of Planning .lack Evans, Pacheco Koch Chad Speas, Corgan Associates Building Inspection file