Loading...
CC ltr. re appvl. on 6/8/04 T H £ ~: I T ¥ 0 F COPPEL June 9, 2004 Mr. Jason Rose 1200 (ollege Parkway, Suite 417 Lewisville, TX 75077 RE: Riverchase Townhomes Addition~ Lots 1-49~ Preliminam,, Plat Dear Mr. Rose: ]'his letter is to inform you that the Riverchase Townhomes Addition, Lots 1-49, Preliminary Plat, to allow the construction of48 single~lhmily attached homes and common areas on 4.42 acres of property located along the east side of Mac,Arthur Boulevard, approximately 1,400 feet north of Riverchase Drive, was approved by the Coppell City' Counctl on Tuesday, June 8, 2004, subject to the following conditions: 1 ) Establish a Homeowners Association to maintain all common areas in this development. 2) Abide by Engineering comments related to this Plat document (attached). 3) Final Plat must be submitted as black-line prints. 4~ A disclosure statement, as approved by the Director of Planning, must be made at the time of the signing of the purchase contract that this development is adjacent to a public park with lighted ball fields to 11 p.m. l:or >our information, Council directed that the Planning and Zoning Commission be the approval authorit> fbr the Final Plat. You have nine (9) months to submit >.our Final Plat (March, 2005) for approval bv the Commission before this Preliminary Plat becomes null and void. ' If?u have any questions, please contact the Plmming Department at (972) 304-3678. G: Di Cc -cctor of Plarming Peebles and Associates Building Inspection file PPELL 'roject ID PP 04-0014 OIYY Off ( OISPI LL 2nd DRC REPORT Project Name COFFELL Riverchase Townhome Add ton, Lots 1-52 'roject Type ~plication Date ;aee Manager roject Description Preliminary Plat 4/21/04 Gary Sieb To allow the construction of 52 single-family attached homes on 442 acres of properly located along the east side of MacArthur Boulevard, approximately 1 400 feet north of R~verchase Dr~ve sqency arks and Recreation ngmeenng 1 of 1 Comments 1 Park Development fee of $128500 per unit, 2 Park hours are 6:30a.m until sunset. 3, The City of Coppelt has an agreement with the Coppell Baseball Association that allows the ball field lights to stay on no later than 11:00 pm, 7 days a week, 4 Developers, and future residents of this development need to be aware of existing ballfield lights that shine towards the townhomes, as well as no~se that will come from games. 1 All off-street parking shall be on HOA owned and maintained lots. 2. All sidewalks on private property will need to be in a sidewalk easement, Drainage Area Map - 1 You show a large area of the City Perk and ballfields to the NW of this property draining through this development Indicate how that drainage will be picked up and conveyed through the site to an appropriate outfall, 2 The developer will need to obtain written authorization to grade any areas on the adjacent private property. 3 Additional comments may be generated during full Engineering review Preliminary Water & Sewer Line - 1. Verify that the 24" and 12" lines are shown properly; make sure you are tying into the 12" line, not the 24" line. 2 For the connection of the sanitary sewer to the existing stub out: verify that the stub out is really there, and that the elevation works for you're proposed sewer line. 3 Remove the General Note that "water service is ~¼" with bullhead connections" 4 Valve spacing needs to be no greater than 500' per the Subdivision Ordinance. 5 The Eng~neenng Dept will work with the developer to provide a iooped fire line during full Engineering review The developer will need to acquire one easement across our park property, as well as permission to cross a city of Irving water line