CC approval on 5/11/04AGENDA REQUEST FORM
COPPELL
DEPT: Planning
DATE: May 11, 2004
ITEM #: 23
ITEM CAPTION:
Consider approval of the Sandy Lake Addition, Lot 3, Block A (McAnelly), Minor Plat, to allow the construction
of an approximate 4,800-square-foot medical office, Phase One being 3,572-square feet and 1,228-square feet in
Phase 2, on 0.83 of an acre of property located along the north side of Sandy Lake Road, approximately 400 feet
west of Samuel Boulevard.
Motion to Approve
GOAL(S):
APPROVED BY
CITY COUNCIL
ON ABOVE DATE
EXECUTIVE SUMMARY:
M - Brancheau
- Tunnell
ote - 7-0
Date of P&Z Meeting: April 15, 2004
Decision of P&Z Commission: Approval (7-0) with Commissioners McCaffrey, Milosevich, Kittreil,
Borchgardt, Halsey, Foreman and Reese voting in favor. None opposed.
Approval is recommended, subject to the following conditions:
1)
(CONDITION MET)
(CONDITION MET)
Staff recommends approval.
Agenda Request Form - Revised 02/04 Document Name: (w~ 6SL3A MP I-AR
CITY OF COPPELL
PLANNING DEPARTMENT
STAFF REPORT
CASE: Sandy Lake Addition~ Lot 3~ Block A {MeAnell¥}~
Minor Plat
P & Z HEARING DATE:
C.C. HEARING DATE:
Apfil15,2004
May ll,2004
STAFF REP.:
Marcie Diamond, Assistant Planning Director
LOCATION:
Along the north side of Sandy Lake Road, approximately 400' west
Samuel Boulevard.
SIZE OF AREA:
0.83 of an acre of property.
CURRENT ZONING:
C (Commercial)
REQUEST:
APPLICANT:
Minor Plat approval to allow the construction of an approximate
4,800sf medical office to be built in two phases.
Dr. George McAnelly
120 S. Denton Tap
Suite 290A
Coppell, TX 75019
972-304-9240
FAX: 972-745-3382
Amhitect:
Joel Stricklin
Blake Architects
1202 S. White Chapel Road, Ste. A
Southlake, TX 76092
817-488-9397
FAX: 817-251-3205
Surveyor:
Doug Connally and Assoc. Inc.
11545 Pagemill Rd. Suite 200
Dallas, Texas 75238
214-349-9485
FAX: 214-349-2216
Page 1 of 3
Item # 9
HISTORY:
There has been no zoning or platting history on the subject property; however, as the
abutting properties sold and developed various mutual access and utility easements
have been established which impact the development of this property. These
easements will be discussed in detail under the DISCUSSION section of this
report.
TRANSPORTATION:
Sandy Lake Road is built as a four-lane divided thoroughfare within
100' of right-of-way.
SURROUNDING LAND USE & ZONING:
North - Peanut Gallery Day Care Center- C (Commercial)
South -Northlake Woodlands East Phase 2 (PD-91-SF-7)
East Vacant C (Commercial)
West - UPS office - C (Commercial)
COMPREHENSIVE PLAN:
The Comprehensive Plan of May 1996 shows the property
as suitable for neighborhood retail uses.
DISCUSSION:
Page 2 of 3
This property is being platted to allow for the development of a 4,800-
square-foot medical office building. The subject tract has never been
platted, but the properties to the north and east were platted as part of the
Sandy Lake Addition in the early 1990's. Various easements, including
access, utility, fire lane and drainage were established abutting and
traversing this tract over the past 14 years. In 1998, sufficient R.O.W. was
dedicated, by separate instrument, to allow for the expansion of Sandy
Lake Road. It also appears that when this property transferred ownership last
year, additional easements were established and various easements were
abandoned and re-established. These activities have resulted in various
conflicts and overlapping easements.
The existing concrete driveway along the northern border of this tract
provides access from the day care to the north and the UPS facility on the
west, to Samuel Boulevard. This easement was partially abandoned and re-
established last year as an access easement. This plat designates this area as
a fire lane easement. Just to the south of that easement, a drainage, utility
and access easement was established in 2003. The site plan indicates
parking and a driveway in this area. The applicant needs to verify that
parking is permitted within this easement.
Item# 9
In the southern portion of this tract, the existing driveway on Sandy Lake
Road will be shared by the subject tract and the existing facility to the west.
This driveway allows access to the existing full median opening on Sandy
Lake Road. However, similar activities have occurred where easements
were dedicated and abandoned and rededicated. Specifically, the 24-foot
wide fire lane proposed by this plat overlays an existing, separately
established cross access and drainage easement. The site plan indicates that
this cross access easement extends beyond the eastern property line, but the
plat indicates it terminating at the property line. Again, the applicant needs
to confirm the location and configuration of this easement.
Finally, along the southern property line there appears to be an existing
TP&L easement, established in 2001, which does not appear on this plat.
RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION:
Staff recommends APPROVAL of Sandy Lake Addition, Lot 3, Block A
(McAnelly), Minor Plat, subject to the following conditions:
1) The applicant confirming location, configurations and uses allowed
in all easements affecting this tract.
2) Graphically indicate the existing TP&L easement adjacent to Sandy
Lake Road.
ALTERNATIVES
1)
2)
3)
Recommend approval of the request
Recommend disapproval of the request
Recommend modification of the request
ATTACHMENTS:
1) Minor Plat
2) Engineering Comments
Page 3 of 3
Item # 9
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM
Sandy Lake Addition, Lot 3, Block A (McAnelly)~ Site Plan, to allow
the construction o£ an approximate 4,$00-squar¢-foot medical office,
Phase One being 3,572-square feet and 1,225-square feet in Phase 2, on
0.$3 o£ an acre o£ property located along the north side of Sandy Lake
Road, approximately 400 feet west of Samuel Boulevard, at the request
of Skip Blake, Blake Architects.
STAFF REP.: Marcie Diamond PROJECT ID# SPA-04-0009
DRC DA TE: March 25, 2004 and April 1, 2004
CONTACT: Ken Gri~n, P.E., Dir. O~Engineering & Public Works (972)304-3686
COMMENTSTATUS: ~vv~t ~.~.~ ta~rnr~vv .~.~ ~FINAL P~SE~
1. Remove the existing clean-out and construct a manhole in its place, or tie into the existing
line downstream of the clean-out. Do not "tap" the existing clean-out.